background image

 

 

Copyright © 2011, PHONO SOLAR 

                                  Page 23 of 29 

WRONG:

 Gap on one end of connector 

 

 

CORRECT:

 No gaps between upper and lower sections of connector 

 

 

STEP 10:

 Verify all connectors are have the same orientation (connector pigtails are facing 

the same way).  

 

 

WARNING: FAILURE TO VERIFY PROPER CONNECTOR ORIENTATION WILL CAUSE 

Содержание PS240 M- 20/U

Страница 1: ...d This Document may not be copied photocopied reproduced translated or converted to any electronic or machine readable form in whole or in part without prior written approval of PHONO SOLAR Product Sp...

Страница 2: ...direct incidental or consequential damages under any circumstances No oral or written information or communications given by PHONO SOLAR or its employees or agents shall alter the scope of this discla...

Страница 3: ...ath or serious injury and or damage to equipment and property CAUTION Indicates a potentially dangerous situation that may result in minor or moderate injury May also be used to alert against unsafe p...

Страница 4: ...the units The ground wire at the service entry should be 14 AWG copper or larger or sized as appropriate within your local jurisdiction electrical code If uncertain check with your local code enforcem...

Страница 5: ...a home computer or laptop PC See the HelioSentry User s Manual for additional information NEED TO KNOW TERMS AC Alternating current DC Direct Current PV Photovoltaic AC Module DC to AC inverter circui...

Страница 6: ...40 C to 70 C Output power temperature derating and maximum full power operating ambient temperature 212 watts out 50 C Derated by the PV above 50 C CEC and Peak Inverter Efficiency 94 5 CEC 95 8 peak...

Страница 7: ...ers IEEE 1547 and 1547 1 Safety Standard for Utility Interactive Inverters IEEE 929 Recommended Practice for Utility Interface of Photovoltaic PV Systems IEEE 519 Harmonic Standard Surge ANSI C62 41 B...

Страница 8: ...ONOSOLAR DC MODULE SPECIFICATION Cells Mono crystal Si 156mm x 156mm square Number of cells 6x10 pieces in series Typical application 20V DC Maximum voltage 600V DC Size 1640 L x992 W x50 H mm Weight...

Страница 9: ...S Cable 0 90m wire 4mm2 Diode s amount 6 pieces Junction Box IP 65 rated ELECTRICAL TYPICAL VALUES1 2 Model Rated Power PMPP Toleran ce Rated Current IMPP Rated Voltage VMPP Short Circuit Current Isc...

Страница 10: ...DC solar panels AC modules eliminate most of the issues associated with ordinary DC string inverter systems AC modules are much easier to install Lower cost to install Far less prone to shading and ot...

Страница 11: ...r package and the contents for signs of damage If there is shipping damage contact the carrier and return the unit to the factory Record the 15 digit PV Module ID number indicated on the front of the...

Страница 12: ...The installer would need to perform a calculation to determine the number of inverters versus the total cable length The AC Module may be mounted in any orientation See Figure 2 The location selected...

Страница 13: ...made of durable corrosion and UV resistant material 1 Mounting With Bolts The frame of each module has 8 mounting holes 14mm 9mm used to secure the modules to supporting structure The module must be a...

Страница 14: ...block the air flow path NOTE Minimum clearance distances must be observed if your AC Module inverter system is to operate at maximum rated output in hot weather NOTE Any mounting location that restri...

Страница 15: ...structions as specified and in the order presented CAUTION Ensure AC conductors have no voltage present Open all AC circuit breakers and verify zero volts are present before proceeding NOTE Use only t...

Страница 16: ...s own AC 20 ampere disconnect breaker NOTE The combined output power of multiple inverters may not exceed the service rating of the circuits to which the inverters are connected Consult ANSI NFPA 70 T...

Страница 17: ...utral The GREEN insulated conductor is protective earth ground The neutral conductor must be bonded to earth ground at your service entry See Figure 4 Secure the Home Run cable from the last AC Module...

Страница 18: ...ength is adequate to reach all modules and the HelioSentry 2 Attach the AC quick connectors to the home run wire See steps1 10 below Space the connections evenly across the modules 3 Secure the home r...

Страница 19: ...CABLE STEP 1 Loosen the screws from the connector STEP 2 Separate upper and lower sections of connector CAUTION Failure to secure the Home Run cable as required could cause fraying of the insulation o...

Страница 20: ...Copyright 2011 PHONO SOLAR Page 20 of 29 STEP 3 Inspect silicone gasket STEP 4 Reseat silicon gaskets back into both sections of connector STEP 5 Verify AC wire to connector orientation...

Страница 21: ...onnector onto AC wire STEP 7 Align upper and lower halves of connector Before securing connector verify alignment by observing to ensure connector teeth penetrate the outer jacket Visually verify the...

Страница 22: ...n when tightening like a car tire Tighten screws snugly and uniformly Do not over tighten STEP 9 Verify the screws are tightened correctly by inspecting both sides of connector Upper and lower sides o...

Страница 23: ...one end of connector CORRECT No gaps between upper and lower sections of connector STEP 10 Verify all connectors are have the same orientation connector pigtails are facing the same way WARNING FAILU...

Страница 24: ...SOLAR Page 24 of 29 DAMAGE TO THE HELIOSENTRY DATA MONITOR This completes the installation of your AC Module s The system is now ready for the commissioning steps Figure 4 is a representative wiring d...

Страница 25: ...rod Electrical codes typically require this to be a one piece agency approved compression connector Agency approved means Nationally Recognized Testing Laboratories such as ETL UL TUV and others The g...

Страница 26: ...n one PV rack ground lug Insert the remaining end of the ground wire in the other lug Tighten both ground lug compression screws to 12 inch lbs Repeat the above steps for subsequent PV rack mounts NOT...

Страница 27: ...t at least 5 minutes Power production will commence five minutes after connection is established to the utility grid provided there is sufficient power available from the photovoltaic modules This fiv...

Страница 28: ...st be performed by qualified service personnel only CAUTION Some of the components inside the AC Module will store a high voltage charge for several minutes after DC and AC power is removed Take all n...

Страница 29: ...enclosure Torque to 10 inch pounds DO NOT OVERTIGHTEN 12 Reinstall the PV module onto the rack 13 Verify that all hardware is tight per the installation instructions 14 Restore AC power to the AC Modu...

Отзывы: