![Philips Xenium Dual Band Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/philips/xenium-dual-band/xenium-dual-band_service-manual_290833005.webp)
Philips Consumer Communications
PHILIPS
CUSTOMER SERVICES
Author : Fabrice TANT
Approval : Jean Pierre HOLLANDE
Operational manager
SERVICE REPAIR SUPPORT
PROCEDURE
PCC/VY/691/E/XENIUMDB989LVL1/0025/MLD/MLD
Revision : 2
Date : 19/06/2000
Page 5 out of 24
6.0 TEST AND INSPECTION PLAN
The test plan is derived from the Product Test Reference for XENIUM DB.
6.1
User Interface Test
Use the Test SIM card “SP” / Production to test the transceiver as follows :
♦
On/off Button
♦
LCD Backlight
♦
Keyboard Test
♦
Buzzer Test
♦
Audio Test
♦
Antenna Test (levels 5 &10)
♦
LCD
♦
LED Test (On/Off)
♦
IMEI
♦
Tester Status/Eeprom Status
With a fast charger connected with the PRODUCT’s bottom connector, check the full scrolling from one mode to the
next when charging IGN (Ignition)-Battery.
6.2
RF Test
The radio test must be performed with a Digital Radio Test Set connected to the mobile RF connector with the
specific RF cable
- 5 -
PCC/VY/691/E/XENIUM989/0025/MLD/MLD