Mechanical Instructions
4.
4.
Mechanical Instructions
Index of this chapter:
4.1 Cable Dressing
4.2 Service Positions
4.3 Assy/Panel Removal
4.4 Set Re-assembly
Notes:
•
Figures below can deviate slightly from the actual situation,
due to the different set executions.
•
Follow the disassembly instructions in the described order.
4.1
Cable Dressing
Figure 4-1 Cable dressing
4.2
Service Positions
When moving or laying down an LCD set, at least two people
should handle the set. Avoid any impact towards the LCD set.
For easy servicing of this set, it must be placed screen down on
Foam bars (created for Service).
4.2.1
Foam Bars
The foam bars (order code 3122 785 90580 for two pieces) can
be used for all types and sizes of Flat TVs. See
for
details. Sets with a display of 42" and larger, require
four
foam
bars [1]. Ensure that the foam bars are always supporting the
cabinet and
never
only the display.
Caution:
Failure to follow
these guidelines can seriously damage the display!
By laying the TV face down on the (ESD protective) foam bars,
a stable situation is created to perform measurements and
alignments. By placing a mirror under the TV, you can monitor
the screen.
4.3
Assy/Panel Removal
4.3.1
Stands
For this set separately orderable stands are available. Remove
the stands before opening the set.
Figure 4-2 Foam bars
1
8
4
3
0_100_090206.ep
s
090206
10000_01
8
_090121.ep
s
090121
1
Re
qu
ired for
s
et
s
42"
1