Installation
2.2
Installation Procedure
The following installation procedure applies to all Antumbra panel variants.
Antumbra panels are powered from the DyNet network, which is classified as SELV/Class II
(for NA) Overvoltage category III in accordance with IEC60664-1(0.8 kV surge).
Ensure that installation of the Antumbra Panel is in compliance with HD 60364 - 4I where
applicable.
Caution:
Use approved DyNet power supplies only with incorporated overload protection.
Disconnect DyNet before attaching the communication module to the application module.
2.2.1
Base Unit Installation
The communication module and application module lock in together when the locating pin
on the Application module lines up with the locating socket on the communication module
(circled below).
Содержание Antumbra
Страница 1: ...Antumbra Installation Guide Revision 02 ...
Страница 2: ...13 October 2017 Antumbra 2 Product Overview ...
Страница 8: ...13 October 2017 Antumbra 8 Product Overview 1 3 2 Hardware Dimensions EU 1 3 3 Hardware Dimensions NA ...
Страница 11: ...13 October 2017 Antumbra 11 Product Overview 1 4 2 Hardware Dimensions EU 1 4 3 Hardware Dimensions NA ...
Страница 14: ...13 October 2017 Antumbra 14 Product Overview 1 5 2 Hardware Dimensions EU 1 5 3 Hardware Dimensions NA ...
Страница 30: ...13 October 2017 Antumbra 30 Ordering Antumbra Panels ...