![Philips 14PV360 Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/philips/14pv360/14pv360_service-manual_323163074.webp)
2-1-1
U25MEN
STANDARD MAINTENANCE
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
H: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B27
Tension Lever Sub Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133
Idler Assembly
I
I
B410
Pinch Arm (A) Assembly
I
I
B414
M Brake S Assembly
I
I
B416
M Brake T Assembly
I
I
B525
LDG Belt
I
I
Содержание 14PV360
Страница 33: ......
Страница 41: ...GND TP504 B TP503 B ADJ VR601 H Adjustment R583 BT6300F01021 A 1 8 33 1 8 34 H V Power Supply CBA Top View ...
Страница 42: ...PIN 5 OF CN571 WF13 Q571 Collector WF12 BT6300F01021 A 1 8 35 1 8 36 H V Power Supply CBA Bottom View ...
Страница 70: ...1 15 3 T6300PEX Packing TAPE TAPE TAPE TAPE X5 S6 X1 TAPE TAPE S4 X2 X4 X3 S3 S1 FRONT S2 ...
Страница 86: ...2 4 6 T6300DA S 12 19 Cap Belt Fig DM11 Fig DM12 20 C 1 21 ...
Страница 95: ......