14
PM1A
To cancel the Limit, repeat the above
procedure and sele
ct “
- - -
”
Limit
Programming the lower insulation limit to perform a “
Pass-fail test.
”
1
-
2
-
5
-
10
-
20
-
50
-
100
-
200
-
500 MΩ
1
-
2
-
5
-
10
-
20
-
50
-
100 GΩ
The equipment will indicate with a BEEP (intermittent sound) when the insulation resistance is lower than
the programmed limit.
Press the key
.