1.4.1 Mounting

Ensure that the Phalcon 2000 is mounted with its base horizontal.

Figure 3  Mounting the Phalcon 2000

Phalcon 2000

Phalcon 2000

Phalcon 2000

Phalcon 2000

The Phalcon 2000 is provided with three M12 tapped holes.  These holes are equispaced on a 200
mm diameter circle, on the underside of the Phalcon 2000.

Ensure that any mounting plate / fixture and screws used for mounting the Phalcon 2000 are of a
material and finish compatible with the stainless steel screw inserts in the moulding – stainless
steel screws are preferred.

Use plain and spring washers beneath each screw and apply a light application of grease to assist
later removal.

Tighten the screws to between 37 – 44 lbf (50 – 60 Nm).

1.4.2 Grounding for Lightning Protection

The internal electron housing is electrically connected to the metal baseplate mounted in the
bottom of the racon housing.  One or more of the external mounting bolts should be connected to
an appropriate earth grounding structure.  If buoy mounted, an insulated copper braid should be
connected from the racon base and immersed at least two feet in the water with the insulating
removed from the immersed section of the braid.

1.4.3 Power Requirements

A DC power source of 9 V to 36 V can be used for the Phalcon 2000.  In most installations, power
will be supplied from a 12 V battery recharged by solar panels.

The power supply connector is on the side of the base moulding, as shown in Figure 4. Note that
pin 6 (the green wire in the supplied cable assembly) is a reference common for the Suppress
Input and Alarm lines and must NOT be connected to the battery lines.

Содержание PHALCON 2000

Страница 1: ...PHALCON 2000 Installation Guide ...

Страница 2: ...ses except under an agreement or with the consent in writing of AB Pharos Marine Ltd and then only on the condition that this notice is included in any such reproduction Use this table to keep a record of the Phaclon 2000 details Phalcon 2000 Serial Number General Order GO Number Morse Code Character Sensitivity Duty Cycle AB Pharos Marine Ltd Steyning Way HOUNSLOW Middlesex TW4 6DL England Teleph...

Страница 3: ...Phalcon 2000 Installation Guide Ref HB 09300 01 Issue 1 iii AMENDMENT RECORD Document Issue ECN NO Sheets Affected Date Incorporated Approval ...

Страница 4: ...0 01 Issue 1 Contents Chapter 1 Installation and Maintenance 1 1 1 Job Set Up Information 1 1 2 Maintenance Requirements 1 1 3 Test Equipment 1 1 4 Installation 2 1 4 1 Mounting 4 1 4 2 Power Requirements 4 1 4 3 Junction Box 7 1 5 Commissioning 9 ...

Страница 5: ...ssary to point out that the Company or any of its associates cannot accept responsibility for any form of personal injury however caused to anyone other than its employees therefore every care should be taken to observe all the normal rules of safety 2 The information contained within this document is correct and complete to our best knowledge and belief The company cannot accept responsibility fo...

Страница 6: ...efinable paint on the interrogating radar display The length of this code is scaled to the length of the received pulse so the paint length on the radar screen remains similar for different range scales The Phalcon 2000 Figure 1 can be mounted on lighthouses buoys bridges offshore platforms breakwaters and other structures that need to be identified as an aid to navigation This handbook covers Ins...

Страница 7: ...Phalcon 2000 Installation Guide Ref HB 09300 01 Issue 1 vii Figure 1 Mechanical mounting details 356mm 3 MOUNTING HOLES M12 x 18 0 DEEP EQUALLY SPACED ON PCD 200 0 705mm ...

Страница 8: ......

Страница 9: ...lubrication WARNING BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIALS OBEY THE MANUFACTURE S HEALTH AND SAFETY INSTRUCTIONS 1 2 Maintenance Requirements Following proper installation and commissioning little maintenance should be necessary To ensure trouble free performance it is recommended that Phalcon 2000 be inspected and cleaned as detailed in the Phalcon 2000 Handbook Ref HB 09300 01 Issue 1 ...

Страница 10: ...e unit must be examined for signs of transit damage and where damage exists the cause must be investigated and the carrier and supplier notified immediately Failure to observe these instructions could invalidate subsequent claims Check all items carefully taking care not to discard smaller items that might be packed separately Table 3 Installation Kit Part No Description Remarks Cable assembly PH ...

Страница 11: ...Phalcon 2000 Installation Guide Ref HB 09300 01 Issue 1 3 Figure 2 Positioning the Phalcon 2000 Phalcon 2000 Phalcon 2000 ...

Страница 12: ... between 37 44 lbf 50 60 Nm 1 4 2 Grounding for Lightning Protection The internal electron housing is electrically connected to the metal baseplate mounted in the bottom of the racon housing One or more of the external mounting bolts should be connected to an appropriate earth grounding structure If buoy mounted an insulated copper braid should be connected from the racon base and immersed at leas...

Страница 13: ...e Phalcon 2000 socket and tighten the retaining ring Ensure the cable is held firmly in place WARNING BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIALS OBEY THE MANUFACTURE S HEALTH AND SAFETY INSTRUCTIONS Apply a waterproof grease or sealant to the connectors A two meter cable assembly is supplied to connect the Phalcon 2000 to the Junction Box and power supply You will need to manufacture the int...

Страница 14: ... failure Brown 2 Interrogate O P Yellow 3 Alarm normally closed to pin 4 Open indicates failure Blue 3 RS485 A Orange 4 Common for Alarm pins 2 3 for Blanking pin 6 Green 4 RS485 B Purple 5 Vin ve Red 5 RS 485 Ground 0V Pink 6 Blanking input 0V O P suppressed 5V or open O P enabled White 6 RS232 In Green 7 5V Blue 8 RS232 Out Black 9 RS232 Signal Ground White Optional Power Connector Data Connecto...

Страница 15: ...nnect a laptop PC or palmtop into the system You can use the laptop PC to get additional information about the operational status of the Phalcon 2000 Figure 5 Junction Box FIXINGS F7 FIXINGS F7 188 188 164 164 SERIAL CONNECTIONS SUPPLY SUPPLY IN PSION CONNECTIONS To PHALCON Y2K 6 7 8 9 1 2 3 4 5 1 1 6 6 5 5 4 4 3 3 2 2 1 1 6 6 5 5 4 4 3 3 2 2 6 3 TB A TB B TB C ...

Страница 16: ...al Block Connection Number Wire Colour Terminal Block Connection Number Wire Colour Serial Connector Pins TB C 1 Black TB A 1 Brown TB C 2 Brown TB A 2 Yellow TB C 3 Blue TB A 3 Orange TB C 4 Green TB A 4 Purple TB C 5 Red TB A 5 Pink TB C6 White Green TB B 3 TB A 6 Blue Black TB B 2 White TB B 5 ...

Страница 17: ...en the Phalcon 2000 is alert or active Two Morse letters U followed by random bleeping as the Phalcon 2000 is interrogated during its alert periods indicate correct operation of the unit The Phalcon 2000 response code and duty period are set at the factory Caution Each module is set and tested for optimum performance at the factory Whilst Phalcon 2000 modules are easy to replace we do not recommen...

Отзывы: