
____________________________________________________________________________________________________________
PFT N2V/N2 FU 400V
2
General Information
04/2004
____________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co.KG
Tel.
+49 (0) 9323/31-760
Postfach 60
Fax
+49 (0) 9323/31-770
D-97343 Iphofen
Internet
www.pft.de
_______________________________________________________________________________________
Initial inspection after delivery
An important task of all technicians delivering the
PFT N2V
conveying pump is the
inspection of the machine settings at the end of the first spraying. The factory settings
can be changed during the first operation. If these changes are not corrected in time,
immediately after run-in, then operating problems can be expected.
After putting the
PFT N2V
conveying pump into service and giving appropriate
instructions, after about two hours, the technician must always carry out the following
checks / make the following settings:
1. Pump pressure, backpressure
2. Remote control switch
WARNING!
The enclosed guarantee card must be sent in – no card, no guarantee!