
PFT G 54 E
Operating Instructions
09/2006
Knauf PFT GmbH & Co.KG
27
Switch on the compressor.
Press the water flow button. The water is now blown out of the manifold
with compressed air (at 1.5 bar for about 1 minute)!
Empty the mixer pump by folding up the entire pump component.
Disconnect and empty the mortar hoses.
The machine is now completely empty with the exception of a small rest in
the screw pump. The machine must still be started carefully the next day
however.
Содержание 00 05 69 13
Страница 34: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 34 Star wheel spare parts drawing...
Страница 36: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 36 Gear box spare parts drawing...
Страница 38: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 38 Mixing tube spare parts drawing...
Страница 50: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 50 Spraying gun spare parts drawing...
Страница 52: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 52 Main power circuit diagram S1079...
Страница 53: ...PFT G 54 E Operating Instructions 09 2006 Knauf PFT GmbH Co KG 53 Controlling current circuit diagram S1079...