6. Maintenance 

6.1. Precautionary Measures During Mainten-

ance Work

Whenever working on the pump ensure the

motor cannot get switched on.
If necessary, remove pump from the system for
inspection. Before dismantling allow the pump
to cool down.

Only dismantle the pump as far is necessary to effect
repairs.

Use only benzin or the like for cleaning. Do not use
solvents.

6.2. Cleaning And Replacing Valves And

Membranes

Under normal operating conditions, the pump is maintenance
free. The valves and the diaphragms are wear parts. If the
rated ultimate vacuum is no longer achieved, the pump interi-
or, the diaphragms and the valves must be cleaned and the
diaphragms and valves must be checked for cracks or other
damage.
Depending on individual cases it may be efficient to check
and clean the pump heads on a regular basis. In case of
normal wear the lliiffeettiim

mee  ooff  tthhee  ddiiaapphhrraaggm

mss  aanndd  vvaallvveess  iiss  >>

1100000000  ooppeerraattiinngg  hhoouurrss.

There can be different numbers of washers 17

in each membrane head. Ensure the correct
assignment for mounting when dismantling the
membrane heads. Don’t confuse the washers
17.

6.3. Dismantling The Membrane Head

Allow the pump to cool down before dismantling.

Using an SW 14 key, unscrew direct screw joint (20) of
interhead connection (10) on diaphragm head 1 (see marks
on the housing).

As far as possible place pump on its side so that the head
to be dismantled points up.

Using an SW 3 key, unscrew the four Allan head screws
(11) and remove head cover (12), taking care with the two
valve plates (13) and sealing rings (14).

Remove intermediate plate (15).

Use a small screwdriver to carefully ease out diaphragm
(16) and manually unscrew from the connecting rod (right-
hand thread). Look out for possible washers (17).

Clean all parts with alcohol and examine diaphragms,
valves and seals for possible damage and renew as
necessary. If a new diaphragm is to be fitted, the washers
(17) of the old diaphragm must be used again otherwise
the pump will not attain the required pressure.

CAUTION

CAUTION

6.4. Assembling The Membrane Head

Assemble all parts in reverse order. The connecting rod
should be positioned in the upper dead point when fitting
the diaphragm. Ensure correct positioning of all parts.

Check correct sealing ring seating.

Re-make hose connection and re-tighten direct screw
joint (20).

Test pump for function.

Содержание MVP 015-4

Страница 1: ...Diaphragm Vacuum Pump PK 800 202 B N D 0501 MVP 030 MVP 015 4 Betriebsanleitung Operating Instructions ...

Страница 2: ...Switching ON OFF The Pump 6 4 2 Intermittent Operations 6 5 What To Do In Case Of Breakdown 7 6 Maintenance 8 6 1 Precautionary Measures During Maintenance Work 8 6 2 Cleaning And Replacing Valves And Membranes 8 6 3 Dismantling The Pump 8 6 4 Assembling The Pump 8 7 Service 10 8 Technical Data 11 8 1 Substances Which Come Into Contact With The Medium 11 8 2 Dimensions 12 9 Spare Parts 12 10 Acces...

Страница 3: ...G Proper use The Diaphragm Pump MVP 015 4 030 may only be used for the purpose of generating vacuum Do not pump corrosive or explosive gases Do not pump liquids Do not operate the pump in locations where there is an explosion hazard Accessories other than those named in this manual may not be used without the agreement of Pfeiffer Vacuum Do not use the connecting line between the heads of the pump...

Страница 4: ... terminal box without mains switch MVP 030 MVP 015 4 Diaphragm Vacuum Pump MVP 015 4 1 Membrane head 1 2 Membrane head 2 3 Membrane head 3 4 Membrane head 4 5 Vacuum flange direct screw joint 6 Voltage supply 7 Exhaust silencer 9 Capacitor 7 4 9 6 3 5 1 2 The diaphragm pump can be applied in all areas where an oil free dry vacuum is required Particularly the pump is suitable as backing pump for ma...

Страница 5: ...t in the system to be evacuated a condensate trap must be fitted upstream of the pump 3 3 Connecting The Exhaust Side Pressure can rise to dangerous levels in exhaust lines Therefore lay exhaust side lines without shut off units Do not connect the exhaust side with a closed system on account of the danger of bursting In certain applications exhaust gases and vapours can be very hot and represent a...

Страница 6: ...ragm Vacuum Pump with with relay box on TC 600 for intermittent operations roughing pump MVP series Relaybox PM 041 937 GT 4 Operations 4 1 Important Information Before starting ensure that impermissibly high pressures cannot build up on the pressure side Interchanging the connections causes dangerous excess pressure levels The pumps should only start when the pressu re difference is max 1 bar bet...

Страница 7: ...rking chamber Clean working chamber Silencer loose or missing Check silencer clean or replace Valves defective Change valves Motor fan defective Change motor fan Con rod or motor bearing defective Inform Pfeiffer Service Pump does not start No mains voltage Check power supply Phase failure Check fuse Motor overheating Allow the motor to cool down and depress mains switch off on Ambient temperature...

Страница 8: ...ssignment for mounting when dismantling the membrane heads Don t confuse the washers 17 6 3 Dismantling The Membrane Head Allow the pump to cool down before dismantling Using an SW 14 key unscrew direct screw joint 20 of interhead connection 10 on diaphragm head 1 see marks on the housing As far as possible place pump on its side so that the head to be dismantled points up Using an SW 3 key unscre...

Страница 9: ...4 Sealing ring 15 Intermediate plate 16 Diaphragm 17 Washer 9 4 10a 1 1 11 20 10 2 7 5 1 Membrane head 1 2 Membrane head 2 4 Membrane head 4 5 Vacuum flange direct screw joint 7 Exhaust silencer 9 Capacitor 10 Interhead connection 1 2 10a Interhead connection 2 3 11 Allan head screw 20 direct screw joint ...

Страница 10: ...amination and invoice this work to you if you have not attached this note This also applies where the operator does not have the facilities to carry out the decontamination work Units which are contaminated microbiologically explo sively or radioactively cannot be accepted as a matter of principle Fill Out The Contamination Declaration In every case the Contamination Declaration must be completed ...

Страница 11: ... Leakrate mbar l sec 1 10 3 1 10 3 Max operating altitude a s l m approx 2000 approx 2000 Max permissible gas and environment temperature C 12 40 12 40 Overload protection coiled temperature switch C 118 118 Noise level dB A ca 52 ca 52 Motor insulation material class B IP 54 IP 54 Power at 230 V 50 Hz W 80 80 Power at 115 V 60 Hz W 80 80 Weight approx kg 7 5 7 5 P Pu um mp p c co om mp po on ne e...

Страница 12: ... an nt t O Or rd d Q Qu ua an nt ti it ty y M MV VP P 0 03 30 0 M MV VP P 0 01 15 5 4 4 Spare parts pack contains 2 PK 050 094 AT not included in the all necessary wear parts delivery consignment 7 Silencer 1 PO 920 791 E not included in the delivery consignmen 10 Accessories P Po os s D De es sc cr ri ip pt ti io on n P Pi ie ec ce es s S Si iz ze e N Nu um mb be er r C Co om mm me en nt ts s r r...

Страница 13: ...The repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to accept any equipment without a declaration This declaration can only be completed and signed by authorised and qualified staff 1 Description of component Equipment type model _________________________ Co...

Страница 14: ...ectromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 23 EEC Produkt Product M MV VP P 0 03 30 0 M MV VP P 0 01 15 5 2 2 Angewendete Richtlinien harmonisierte Normen und angewendete nationale Normen Guidelines harmonised standards national standards which have been applied D DI IN N E EN N I IS SO O 1 12 21 10 00 0 1 1 D DI IN N E EN N I IS SO O 1 12 21 10 00 0 2 2 E EN ...

Страница 15: ...Fax 49 0 64 41 8 02 2 02 info pfeiffer vacuum de www pfeiffer vacuum net Your Vacuum Technology Experts in Turbo Pumps Rotary Vane Vacuum Pumps Roots Pumps Dry Vacuum Pumps Leak Test Units Valves Flanges Feedthroughs Vacuum Measurement Gas Analysis System Technology Service ...

Отзывы: