Mounting and commissioning the machine
8 - 8
8
.01.08
Tightening the V-belt
●
Loosen nut
1
.
●
By swinging the motor
2
, tighten the V-
belt accordingly.
●
Tighten nut
1
.
Fig. 8-03
shows a Quick-motor.
When using a different motor,
follow the instructions in the
motor manual.
Fig. 8 - 03
8
.01.09
Fitting the top belt guard
●
Attach belt guard
1
to the machine case
with three screws.
Fig. 8 - 04
1
2
2 cm
1
Содержание 5704
Страница 21: ...Mounting and commissioning the machine 8 2 8 01 02 Table top drill hole plans for mid height assembly ...
Страница 22: ...Mounting and commissioning the machine 8 3 8 01 03 Table top cut out for mid height assembly ...
Страница 23: ...Mounting and commissioning the machine 8 4 8 01 04 Sewing head support plate for mid height assembly ...
Страница 25: ...Mounting and commissioning the machine 8 6 8 01 06 Table top cut out for assembly level with the table top ...