Care and maintenance
10 - 5
10
.07
Oiling the machine
Fig. 10 - 07
Switch off the machine!
Danger of injury if the machine starts accidentally!
●
Before commissioning and before operation after long downtimes, a few extra drops of
oil should be applied to the needle bar and hook bar (see arrow).
Only use oil with a mean viscosity of 22.0 mm2/s at 40°C and a density of
0.865 g/cm3 at 15°C.
We recommend
PFAFF sewing machine oil, part no. 280-1-120 144.
Содержание 5704
Страница 21: ...Mounting and commissioning the machine 8 2 8 01 02 Table top drill hole plans for mid height assembly ...
Страница 22: ...Mounting and commissioning the machine 8 3 8 01 03 Table top cut out for mid height assembly ...
Страница 23: ...Mounting and commissioning the machine 8 4 8 01 04 Sewing head support plate for mid height assembly ...
Страница 25: ...Mounting and commissioning the machine 8 6 8 01 06 Table top cut out for assembly level with the table top ...