![PEUGEOT ENERGYStand-2000R Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/peugeot/energystand-2000r/energystand-2000r_using-manual_1533887019.webp)
en
Set the saw on the brackets so
the screws match the holes in
the base of your machine, then tighten.
The machine is now in solidarity with
the arm and can be moved or removed
very easily.
Installation Procedure and folding
1. Submit saw the support.
2. Retract extensions to reduce the size of the bridge.
3. Press the lever A1 of each leg to fold under Part
the upper bridge until the button snaps into pressure
closed position.
Before any transport operation, ensure that all parts and
moving parts of the set are secured in the clamped position.
Installing retractable arm (M)
Place on a well established stable surface.
1
2
3
4
5
6
7
8
5
6
100518-2-Manual-C.indd 19
10/12/15 10:54:17