
Petersen Products 128 Series
Pre-installation Inspection
3
Gather all necessary equipment and tools. Refer to Hot Tap Insertion Tool Checklist.
1. Ratchet Puller
5. Tape Measure
2. Socket
6. Wrench
3. Torque Wrench
7. Marker
4. Allen Wrench
8. O-Ring Lubricant
If using a Retraction System, verify that all Retraction System components are complete.
10. Ram Removal Plate
13. Ram Section, 36 inches
11. Ram Section, 24 inches
14. Pull Block Assembly
12. Ram Coupling
15. Pulley Assembly
1
2
3
6
8
5
7
4
10
11
12
14
15
13