![Perle PERLE P850 Скачать руководство пользователя страница 97](http://html.mh-extra.com/html/perle/perle-p850/perle-p850_user-and-system-administration-manual_1530555097.webp)
Servicing Information
91
V.11 / X.21 DB25 to DB15
Connector Cable
Figure C-10 V.11 / X.21 DB25 to DB15 Connector Cable
NOTE For U.K. Approval:
The connecting cable may be any length between 0 and 5M.
DB25 MALE
1
DB15 MALE
2
3
10
8
20
16
12
23
1
4
8
5
12
13
9
6
11
3
10
Protective Ground
Transmit Data (A)
Receive Data(A)
Indication (A)
Signal Element Timing (A)
Signal Ground
14
15
7
Indication (B)
Transmit Data (B)
Control (B)
Receive Data (B)
Control (A)
Signal Element Timing (B)
Protective Ground
Transmit Data (A)
Control (A)
Signal Element Timing (A)
Receive Data (A)
Indication (A)
Signal Ground
Transmit Data (B)
Control (B)
Receive Data (B)
Indication (B)
Signal Element Timing (B)
Содержание PERLE P850
Страница 6: ......
Страница 21: ...Installation 15 Figure 1 4 Front View of the P850 router Tx Rx Power ...
Страница 83: ...Octet Locations on Ethernet Frames 77 Octet Locations on a Bridged XNS Frame ...
Страница 101: ...Servicing Information 95 ...
Страница 106: ...100 Router A PC used for TFTP transfers Link 1 Link 2 Router B Router C ...