25
IDS-710HP Hardware Installation Guide
Appendix E - IDS Maintenance
• Ensure there is clearance of 50.8mm (2 inches) on all sides of the IDS switch to pro
-
vide proper airflow through the unit
• Do not use solvents or cleaning agents on this unit
• Keep vent holes clear of debris
• If case gets dirty wipe with a dry cloth
• Ensure all cables are in good working condition
• Replace any frayed cables or cables without clips