Perle IDS-105G Скачать руководство пользователя страница 13

 

                                                  IDS-105G Installation Guide 

- 13 - 

 

Wiring up the IDS-105G 

 

Power sources must be off prior to beginning the power connection 
steps. 

  

Ensure that the voltage and current ratings of the intended power 
source are appropriate for the IDS-105G as indicated on the product 
label. 

   

Ensure that the installation and electrical wiring of the equipment is 
performed by trained and qualified personnel and that the installation 
complies with all local and national electrical codes 

          

 

If this unit is to be installed in a location where the ambient 
temperature exceeds 50C, the case temperature may exceed safe 
levels. For this reason, this unit should be installed in a restricted 
access location where access can only be gained by service 
personnel or users who have been instructed about the reasons for 
the restrictions applied to the location and about any precautions that 
shall be taken; and access is through the use of a tool or lock and 
key, or other means of security, and is controlled by the authority 
responsible for the location. 

Hazardous Location Warnings 

(safe conditions for use:) 

 

Subject devices are to be installed in an ATEX Certified IP54 (as 
defined in IEC 60529) enclosure and accessible only by the use of a 
tool. 

 

 

Subject devices are for use in an area of not more than pollution 
degree 2 in accordance with IEC 60664-1. 

 

 

These devices are open-type devices that are to be installed in an 
enclosure with tool removable cover or door, suitable for the 
environment. 

 

  

This equipment is suitable for use in Class I, Division 2, Groups 
A,B,C,D or only non hazardous locations only. 

 

 

WARNING –EXPLOSION HAZARD – Do not disconnect equipment 
unless power has been removed or the area is known to be non-
hazardous 

 

 

WARNING EXPLOSION HAZARD – Substitution of any components 
on this switch may impair suitability for Class I, Division 2. 

 

 

Provision shall be made to prevent the rated voltage being exceeded 
by the transient disturbances of more than 140% of the peak rated 
voltage. 

Содержание IDS-105G

Страница 1: ...Perle IDS 105G XT Unmanaged 10 100 1000 Ethernet Switches P N 5500340 10 Rev D Installation Guide...

Страница 2: ...of MSA complaint SFP modules Visit the Perle website for the most up to date installation guides models and specifications http www perle com Note xxxxxxxx indicates models numbers for this product l...

Страница 3: ...Full Half duplex auto negotiation on copper ports Redundant DC power inputs Rugged high strength case Industrial temperature models DIN rail or wall panel mounting Note In this guide the various mode...

Страница 4: ...4 IDS 105G Installation Guide Front View of IDS 105G 5 port RJ 45...

Страница 5: ...IDS 105G Installation Guide 5 Front View of IDS 105G with two SFP transceiver ports...

Страница 6: ...6 IDS 105G Installation Guide Front View of IDS 105G with one fiber port...

Страница 7: ...AC power sources If one power source fails the other acts as a backup and automatically powers the switch Reset Button To reset the IDS 105G insert a paper clip into the air hole vent and gently pres...

Страница 8: ...nd Ethernet activity detected Off Link down 7 Port 7 SFP Green LED On Link up Flashing Link up and Ethernet activity detected Off Link down Ethernet Port Status Port Link Speed Green and Yellow LEDs O...

Страница 9: ...IDS 105G Installation Guide 9 Views for the IDS 105G Note all dimensions are in mm...

Страница 10: ...10 IDS 105G Installation Guide...

Страница 11: ...p of the DIN rail fits into the slot on the top of the DIN rail clip just below the hook and behind the spring 3 While pushing down on the unit to compress the spring rotate the bottom of the IDS 105G...

Страница 12: ...s into the wall leaving about 2 mm of the screw protruding from the wall to allow room for sliding the wall mount panel between the wall and the screws 5 Once the screws are fixed to the wall insert t...

Страница 13: ...d access is through the use of a tool or lock and key or other means of security and is controlled by the authority responsible for the location Hazardous Location Warnings safe conditions for use Sub...

Страница 14: ...nding lug not provided One 12 AWG wire not provided Connecting Power to the IDS 105G 1 Ensure the power source is off prior to connection 2 Strip both wires 12 20 AWG 5 mm 3 16 th inch 3 Loosen the te...

Страница 15: ...thernet enabled devices See below for pinouts 8 pin RJ 45 Remaining pins not used Fiber Port Cabling Requirements MM 50 125 microns or 62 5 125 microns SM 9 125 microns Connect the fiber cables to Por...

Страница 16: ...dustrial Models IDS 105G D SFP XT and IDS 105G xxxxxxxx XT 0 C to 60 C 32 F to 140 F 40 C to 75 C 40 F to 167 F Storage Temperature Commercial Models IDS 105G D SFP and IDS 105G xxxxxxxx Industrial Mo...

Страница 17: ...0 Min 6 Max 0 Min 17 Max 3 11 IDS 105G M2ST2 ST None MM duplex 2 km 1 2 miles TX 1310 RX 1310 Min 6 Max 0 Min 17 Max 3 11 IDS 105G S2SC10 XT SC None SM duplex 10 km 6 2 miles TX 1310 RX 1310 Min 9 5 M...

Страница 18: ...1550 Min 2 Max 5 Min 23 Max 3 21 IDS 105G S1SC80U ST None SM simplex 80 km 49 7 miles TX 1510 RX 1590 Min 2 Max 3 Min 26 Max 3 24 IDS 105G S1ST80D ST None SM simplex 80 km 49 7 miles TX 1590 RX 1510 M...

Страница 19: ...at the link below A Technical Support Query may be made via this web page www perle com support_services support_request shtml Warranty Registration This product is covered by the Perle Ethernet Swit...

Отзывы: