Operation
Wear suitable protective clothing, gloves and eye protection. Disposal of all waste should be in accordance with local
regulations.
Cooler setting
Turn the circulating water bath on and set the desired temperature according to the kit insert. Allow time for the water
to reach the desired temperature.
Power setting
Set the desired run profile according to the kit insert. Ensure that the power supply wires are connected before the
power unit is turned on.
Electrode setting
Adjust the cathode and anode spacing to the desired distance using the thumb screws (loosen, set location, tighten)
Figure 16: Black thumb screws for setting anode position
Figure 16: Black thumb screws for setting anode position
2118-0010 - Migele
®
Gel Electrophoresis Unit User Manual
Operation
21
Содержание Migele
Страница 1: ...2118 0010 User Manual Migele Gel Electrophoresis Unit ...
Страница 2: ......
Страница 23: ...Figure 14 Connecting the units 2118 0010 Migele Gel Electrophoresis Unit User Manual Installation 19 ...
Страница 24: ...Figure 15 Stacked GEUs 2118 0010 Migele Gel Electrophoresis Unit User Manual Installation 20 ...
Страница 40: ...36 ...
Страница 41: ......