background image

 8

Lower the Curtain to the lowest point that you 

want the curtain to be. Install one 

s

crew in the 

center area of the Curtain Box. This will need 

to be done from the inside of the structure and 

while the Curtain is lowered.

Pull 

c

able 

t

hrough complet

e

ly.

Raise the Curtain up from the bracket

,

 run 

the 

c

able through the hole on the end of the 

Curtain Rod.

Fasten the Cable Mounting Bracket to post 

using (2)2

 

1/2’’

P

an 

H

ead 

S

crews.

Locate the Cable Mounting Bracket. Align the 

hole of the Cable Mounting Bracket to the hole 

in the Curtain Rod as shown.

Using a 6” 

dr

ive 

b

it, install the screw in the 

center area up into the Block or Top Plate. 

(Depending on the type of 

s

tructure.)

Содержание Sunbrella Side Shade

Страница 1: ...Assembly Manual Sunbrella Side Shade ...

Страница 2: ...er I Hooks Control Rod Cable Clamps 2 Pan Head Screw 3 1 2 Lag Bolt w Washers 3 Brown Screw Wrench Vice Grip Dikes Wrench with 9 16 socket and 6 exten Mounting Block Tools you need but not included Cable Mounting Bracket 1 4 Drill Bit 2 6 Step Ladders ...

Страница 3: ... complete installation instructions Pavilions with arched headers Place the Curtain Box up against the Top Plate of the Pavilion and in against the Post Trim Fasten with 3 8 Lags Vinyl Traditional Roof Pavilion Do Not Use This Hole Place the blocks on the Curtain Box up against the Top Plate of the Pavilion and in against the Post Trim Fasten with 3 8 Lags There will be an extra hole in the Bracke...

Страница 4: ...install the double 2x6 Block between the first two Rafters at each end Place in against the Post Trim and flush with the bottom of the Rafters Fasten with four Timber Lock Screws from each end Place the Curtain Box up against the Rafters and in against the Post Trim Fasten with 3 8 Lags If installing on the side with the Header overhang place the Curtain Box up against the Headers and in against t...

Страница 5: ...rilled holes Place the Curtain Box up against the Top Plate and the 2x6 Block and in against the Post Fasten with 3 8 Lags If installing on the side with the Top Runner overhang install the 4x4x4 Glu Lam Block onto the outside of the Rafter Align with the outside end of the Post and the bottom of the Top Plate Fasten to the Rafter with four Timber Lock Screws Place the Curtain Box up against the B...

Страница 6: ...from the outside Use a speed square to align Mounting Block with Post Remove the End Cap from the Curtain Assembly Begin by placing the Curtain Assembly close to the project site Carefully remove protective shrink wrap from the Curtain Assembly and remove all parts Fasten Mounting Blocks to the Rafter using 3 Brown Head Screws through all predrilled holes ...

Страница 7: ...urtain Assembly to Pavilion Using 1 4 Drill Bit pre drill through the Mounting Bracket into the Mounting Block approximately 3 1 2 Fasten using 2 3 1 2 Lags Fasten opposite side using previous steps Ensure the Gear Handle and Cable are pointing down ...

Страница 8: ... through completely Raise the Curtain up from the bracket run the cable through the hole on the end of the Curtain Rod Fasten the Cable Mounting Bracket to post using 2 2 1 2 Pan Head Screws Locate the Cable Mounting Bracket Align the hole of the Cable Mounting Bracket to the hole in the Curtain Rod as shown Using a 6 drive bit install the screw in the center area up into the Block or Top Plate De...

Страница 9: ...nd turn the nut onto the bolt just so it is started Locate the Cable Clamp and slide the cable through the clamp Run the cable through the I hook Pull the cable tight and push the Cable Clamp down against the I Hook Then run the end of the cable back through the Cable Clamp ...

Страница 10: ...e The cable can have a little play Crimp the Cable Clamp Install opposite side using previous steps Cut the excess cable Fasten End Caps using 2 Pan Head Screws through all pre drilled holes Enjoy your new Sunbrella Side Shade Pergola Kits USA Customer Support 800 403 9259 ...

Отзывы: