Performax GTC2DP Скачать руководство пользователя страница 5

5 of 6 

 

Step 5 

– Top Assembly 

Attach the top to the back and side assembly. Position the top so that the tabs on the top align with the rectangular 

holes on the back end of the left and right side panels. It helps to slightly lift the back and side assembly and 

engage the tabs one at a time. Check to make sure the tabs have engaged properly and that the screw holes have 

aligned (use a small tipped screwdriver to assist in aligning the holes if necessary). Using five M6*10 bolt and M6 

nuts, finalize the attachment of the top to the side and back assembly (see figure 5 for screw locations).Using two 

nuts and bolts attach the top to the left and right side panel. Then place unit upright and use the last three nuts and 

bolts to attach the top panel to the back panels. Tighten all fasteners to ensure the unit is squared. 

 

 

 

Step 6 

– Door Assembly 

With the door hinge pins pointed down, select the door with the lock assembly. (see figure 6). This is the right hand 

door. Take the right 

hand door and align the door’s hinge pins with the companion hinges located on the right side 

panel.  Some  of  the  hinge  pins  may  have  come  out  of  alignment  during  shipping  and  handling.  If  so,  move  the 

hinge pins back to proper alignment. Slowly and carefully slide the hinge pins into the holes to properly seat the 

door. Repeat the same process for the left door. 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 

– Door Assembly                                                                              Figure 7 – Shelf Assembly 

 

 

 

Step 7 

– Shelf Assembly 

First select a shelf position. Angle the shelf so that the shelf will engage the square notches on the side panels of 

the cabinet, being sure shelf is level. Seat the shelf into the notches. Repeat the process for all remaining shelves. 

 

 

 

 

Отзывы: