S
1
2
3
4
5
Step#6 – A
1. Grab the
both ha
another
the pull
Right (1
(CAUTIO
2. Grab the
with both
another
the pull
Spot Ri
Upright
Arm is h
3. Repeat f
Holder L
Arm (15
4. When us
and Sa
make s
machine
are fully
positions
catches
NOTE
:
engaged
5. Locate
(
NOTE:B
BAR H
ARM
with the
the catc
down to
the pull
into the
Assemble B
e Bar Hold
nds, one o
one on the
pin and ins
6) to the
ON: Bar Ho
e Safety Sp
h hands, on
one on the
pin and
ight Arm (
(5). (CAUT
heavy.)
for the abov
Left (14) an
).
sing the Ba
afety Spot
ure they a
e at the sa
y engaged
s. When
it should b
ensure t
d.
the
BOTH PI
HOLDER &
MUST BE
pull pin ex
h into the s
insure the
pin. (
NOTE
slot). As im
Bar Holder
er Right (1
on the hand
e pull pin.
tall the Bar
Right Uprig
older is hea
pot Right Ar
ne on the a
e pull pin.
install the
(17) to the
TION: Safet
ve process
d Safety Sp
ar Holders (
t Arms (1
are install
me level a
d in the m
a Arm is
be level to
the safety
desired
NS INSID
& SAFETY
IN THE
xtended an
slots on the
Catch is se
E
: make su
mage shown
& Safety S
6) with
dle and
Pull up
Holder
ght (5).
vy).
rm (17)
arm and
Pull up
Safety
e Right
ty Spot
for Bar
pot Left
14&16)
15&17),
on the
nd that
mounting
on the
the floor.
pin is
height,
DE THE
Y SPOT
SLOTS
),
nd holding
e mounting
eated into t
ure the pin
n.
page15
Spot Arm t
the handle
plate, then
he slot. Let
is fully eng
to Upright
e push
n push
t go of
gaged
Содержание PB EXTREME 6453
Страница 1: ...AS SSEM MBLY PB E MOD INSTR EXTRE DEL 6 RUCT EME 6453 TIONS HALF S F RAC CK ...
Страница 17: ...LABE 300 13m 115 60m ELS mm mm page17 ...
Страница 18: ...HARDWAR RE page18 ...
Страница 19: ...page19 ...
Страница 20: ...Rev A Aug 2014 ...