background image

Installation Manual             

 

Last revised: January 2011

         

The technical specifications are subject to change without notice

 

page 6

 

5.

 

Electrical connection 
 

 

Only specially trained and qualified personnel may make the electrical connection! 

 

The maximum system voltage of solar modules connected with each other may not exceed 
1000VDC! When designing the system, please note that the module voltage increases when the 
temperatures are low. 

 

Only connect solar modules of the same type and power category with each other. 

 

For the electrical connection, the solar modules are equipped with a junction box and solar 
cables with plugs. 

 

The plugs are marked with the respective polarity. Ensure that the polarity is correct and that 
the connections are secure and tight. 

 

Never connect or disconnect electrical contacts when under load! 

 

Always use special solar cables with a diameter of at least 4 mm² for further wiring. 

 

We recommend securing the cables to the mounting system, using UV-resistant cable ties, to 
avoid the pin and socket connections being at a water-settlement level. 

 

The junction-boxes are equipped with 3 bypass-diodes. In the event of clouding, these 
minimize the losses and help to prevent damage to the solar modules. 

 

 When connecting the solar modules to an inverter, please observe the information provided 
by the manufacturer of the inverter. 

 

6.

 

Grounding 
 

 

The company installing the solar module frame is also responsible for proper grounding. 

 

If the building is already equipped with an exterior lightning protection system, the PV-
installation must be integrated in the protection system against direct effects of lightning. 
Country specific standards must be adhered to. 

 

Attach a separate conductor as grounding wire to one of the 4mm diameter grounding holes on 
the module frame with a set of M4 bolt, cup washer, flat washer, tooth washer and M4 nut. 
This is to ensure positive electrical contact with the frame. 

 

For the position of the grounding holes, please refer to the technical drawing in paragraph 4.3. 

 

Ensure that the anodized layer of the frame is penetrated and a secure electrical contact is 
created with the frame.  

 
Drawing

:  

 
 

  

 
 
 
 
 

 

Содержание PEM-160/X-72M

Страница 1: ...les by Perfectenergy in outdoor open spaces fields or on flat or tilted roofs They are only for specialists who are familiar with the installation due to their vocational qualification and they contain safety relevant instructions for the assembly connection and maintenance of the solar modules Important Notice The installation of the solar modules and especially the electrical installation may on...

Страница 2: ...e more current and or voltage than reported at standard test conditions Sunny cool weather and reflection from snow or water can increase current and power output Accordingly the values of Isc and Voc marked on this module should be multiplied by a factor of 1 25 when determining component voltage ratings conductor current ratings fuse sizes and size of controls connected to the PV output Our prod...

Страница 3: ...glass is broken or the backsheet is torn contact with any module surface or module frame can cause electric shock Cover all modules in the PV array with an opaque cloth or material before making or breaking electrical connections Electrical commissioning of the solar modules may only be carried out by a professional installer Do not connect or disconnect modules when current from the modules or an...

Страница 4: ...ast 500m from the sea and sulfur sulfur sources volcanoes The modules may not be exposed to extremely corrosive chemicals e g emissions from manufacturing plants When installed on a roof the module shall be mounted over a fire resistant roof covering rated for the application 4 2Instructions for mounting Assembly work may only be performed by trained and qualified personnel Fasten modules firmly t...

Страница 5: ...gn strength of 5400 Pa corresponds approximately to a wind speed of 500 Km h 300 mph PEM 160 X 72M PEM 180 X 72M SCC Screw attachment Secure the module to the structure using the factory mounting holes Four M8 stainless steel bolts with nuts washers and lock washers are recommended per module Refer to the drawing on the right for the module dimensions and mounting hole locations Clamps admissible ...

Страница 6: ...resistant cable ties to avoid the pin and socket connections being at a water settlement level The junction boxes are equipped with 3 bypass diodes In the event of clouding these minimize the losses and help to prevent damage to the solar modules When connecting the solar modules to an inverter please observe the information provided by the manufacturer of the inverter 6 Grounding The company inst...

Страница 7: ...ng materials such as scouring powder steel wool scrapers blades or other sharp instruments to clean the glass surface of the module Use of such materials will invalidate the product warranty The PV system should be inspected once a year with regard to the following Secure hold and no rust on any of the attachments Secure connection cleanliness and that all cable connections are free of corrosion S...

Отзывы: