6
PREPARING FOR INSTALLATION
STEP 1:
SLIDE OUT CHASSIS REMOVAL
1.
Locate tabs on the bottom of the front grille and
gently pull out, lift up, and slide the grille to the left.
front grille
front case
filter
2.
Locate the handle on the bottom of the filter. Gently
pull up and out to remove from the panel.
filter
front case
filter handle
3.
Remove screws from the front panel and set aside to
reinstall later.
4.
To remove the front panel, grab the bottom and lift up
to release.
STEP 2:
REMOVING AIR CONDITIONER FROM
THE CABINET
1.
With the front panel removed, locate the locking
bracket and screw found on the bottom left-hand
side of the unit. Set aside to reinstall later.
2.
Remove the grounding screw found on the bottom
right-hand corner and set aside to reinstall later.
3.
Carefully slide the air conditioner from the cabinet by
gripping the base pan handle and pulling out.
NOTE: Do not lift, push, pull or remove any expanded
polystyrene (foam) from inside the air conditioner. It is not
packing material.
WARNING
DO NOT operate unit with shipping foam blocks in
place. Always remove prior to running unit.
STEP 3:
REMOVE PACKING MATERIALS
• Remove and dispose of or recycle all packaging
materials. Remove tape and glue residue from
surfaces before turning on the air conditioner. Rub a
small amount of liquid dish soap over the adhesive
with your fingers. Wipe with warm water and dry.
• Do not use sharp instruments, rubbing alcohol,
flammable fluids, or abrasive cleaners to remove tape
or glue. These products can damage the surface of
your air conditioner.
• Handle air conditioner gently.
WARNING
EXCESSIVE WEIGHT HAZARD!
To reduce the risk of personal injury, we advise you have the assistance of 2 or more
individuals while moving and installing the air conditioner. Failure to do so can result in
back or other injuries. A room air conditioner can weigh between 70–240 lbs.