Pequod Acoustics Srl.
Via del Madonnone 25, Florence, Italy
www.pequodacoustics.com
[email protected]
As anchoring:
As regards the assembly and possible ancho-
ring of Hydra during installation, the straight
part must be hinged at the bottom and, rotated
up to the vertical by the operator (see picture),
put the bolts metric thread M10 on the flange,
as shown in the figure, and tighten in cross or
-
der (opposite diameters)
If necessary, there is the possibility of ancho-
ring the 4 feet of Hydra to the ground, by means
of screws, metric thread M12, screwed betwe-
en the floor and threaded insert M12, placed in
each foot of the product.
USER GUIDE
Grower
1
2
3