Installation Guide
Peppers Cable Glands Limited
Stanhope Road, Camberley,
Surrey, GU15 3BT, UK
CT0033 V1.0
CR-C*** Type Installation Guide
11.
Support the cable and rear gland assembly. With unarmoured cable, hold Cone and
cable roughly concentric. Splay out the cores. Starting at the middle, pack small
amounts of rolled-out compound between the cores. Re-straighten each core and
work outwards until all gaps are filled. Bundle the cores with cord or tape so they are
not disturbed. Pack around the outside of the outer cores to fill the Cone cup. Build up
compound around the outside of the cores with a slight taper and to approximate
compound length shown on the diagram and Table 1 column 11 as detailed in the
installation instructions