AS-i CC-Link Gateway
Installation
14
.4.20
15
11
6.
Installation
6.1
Safety notes
Read instruction:
Before working with this unit: read these instructions carefully and completely. All notes on safety and
specifications of the device manual and the manual for the configuration software are to be considered!
Ensure appropiate installation:
Electrical installation is to be performed by trained expert personnel. During installation care must be
taken that supply and signal leads and also the AS-i bus cable are laid separately from power cables. In
the switchgear cabinet it must be ensured that appropriate spark-quenching equipment is used with con-
tactors. Where drive motors and brakes are used, attention must be paid to the installation instructions in
the corresponding operating instructions. Please note that the maximum line length of the AS-i bus cable
is 100 m. Cables above that length require the use of a suitable circuit extension.
HAZARDOUS VOLTAGE:
Before any installation, maintenance or modification work: Disconnect your system from the supply net-
work. Ensure that it cannot be reconnected inadvertently!
You are requested to make sure that the unit will be recycled by the end of its service life.
Содержание AS-i CC-Link Gateway
Страница 1: ...AS I CC LINK GATEWAY FACTORY AUTOMATION MANUAL...
Страница 13: ...AS i CC Link Gateway Installation 14 4 2015 13 6 4 Dimensions mm 55 85 120 7 76...
Страница 67: ......