VMP2
VMP1-IO1 Module (Optional)
ID 24855, Rev. 02
Page A - 8
© 2002 PEP Modular Computers GmbH
A.6 Board Installation
In order to keep the installation process as simple and easy as possible please follow
the recommended order of work:
1.
Instal the PMC module on the VMP1-IO1
2.
Instal the package, VMP1-IO1 plus PMC module, on the baseboard (in this case
the VMP2)
Installation of the VMP1-IO1 Module on the VMP2 Baseboard
3.
Place the VMP1-IO1 exactly above the VMP2
4.
Plug them togethor
5.
Use 4 screws (2.5
×
6 mm) to secure the board to the VMP2
PMC Module Installation
6.
Place the EMC gasket on the bezel of your PMC-Module
7.
Push the PMC bezel into the window of the front-panel of the VMP2 and plug the
connectors together.
8.
Use three screws (M2.5
×
6mm) to secure the module to the board
ESD Equipment!
Your carrier board and PMC module contain electrostatically sen-
sitive devices. Please observe the necessary precautions to avoid
damage to your board:
•
Discharge your clothing before touching the assembly. Tools
must be discharged before use.
•
Do not touch components, connector-pins or traces.
•
If working at an anti-static workbench with professional dis-
charging equipment, please do not omit to use it.
StockCheck.com