5
Step 3:
Remove junction box cover
and make all connections inside
junction box to all incoming
control panel wires.
Step 4:
It is required that the customer
furnish and install a conduit
seal outside the basin to prevent
surface water from entering the
junction box.
Electrical Connections:
NOTE: Failure to use a Pentair
approved control panel voids
the pump warranty and
guarantee.
IMPORTANT: Properly
connect the panel ground wire
to a grounding rod. Improper
grounding voids warranty.
Panel Wiring:
Step 1:
Ensure power source is off or
disconnected.
Step 2:
Connect pump power, seal failure
heat sensor, and float cords to
panel terminals per the schematic
provided. All conduits and cables
entering the panel must be sealed
off.
For single phase pumps: Check
panel wiring to ensure white, black,
and red pump leads are connected
according to the schematic and
panel wire labels. Single phase
pumps will run only if connected
one way.
For three phase pumps:
Interchange any two line leads
to the motor inside the panel if
the pump rotates in the wrong
direction.
Do not leave pump in basin
unless it is placed in operation.
If a pump has been out of service
for an extended period of time,
with the power off, rotate the
impeller by turning the radial
cutter with a screwdriver to be
sure it rotates freely.
FINAL BACKFILL FOR BASIN SYSTEMS
TYPICAL INSTALLATION
Содержание Hydromatic TL-Pro
Страница 11: ...THIS PAGE INTENTIONALLY LEFT BLANK ...