background image

6

11. Manual pumps. all general 

instructions for automatic 

pumps apply to manual pumps 

except the level switch is not 

used and the power cord does 

not have a vent tube.

  manual models have the plug 

(12) in switch cap for installing 

a fitting to air test the pump 

for leaks. replace all plugs 

with Permatex on threads. The 

switch housing seat is tapped 

and plugged with pipe plug.

HydromaTic  pumps have a 

small air vent hole in the impeller 

cavity to let out trapped air. if this 

hole becomes plugged, pump may 

air lock. To break the air lock, use 

a small screwdriver to clear hole 

in the impeller cavity.
as a secondary precaution in 

installations of this type, 1 ⁄ 16” 

hole should be drilled in the 

 

 

discharge pipe below the check 

valve. The check valve should 

be 12 to 18 inches above pump 

discharge. do not put check valve 

directly into pump discharge 

opening.

nOTE:  in sumps where the 

pump is operating daily, air 

 

locking rarely occurs.

  Pump is now ready for check 

run before air testing and 

 

filling with oil. Plug cord 

 

(21) into power receptacle and 

push up on switch chamber 

diaphragm (23) to start motor. 

motor should start and run 

smoothly. When pressure is 

released on diaphragm, motor 

should stop. repeat operation 

2 to 3 times to be sure 

 

operation is satisfactory and 

not binding.

9.  Air test. To air test unit, put 

air fitting in plug opening (12) 

and charge motor housing with 

air to 7 psi.

 Do not use higher 

pressure or seal will be blown 

open.

 charge switch cap with 

air through nylon vent tube 

as described earlier and place   

complete unit under water.

  No air bubbles should show 

on this test. if leak shows, 

 

unit must be dismantled to 

 

correct leak.

10. Oil fill.  after  air  test  is           

satisfactory, remove from 

water and wipe or blow off 

any excess water.

  Do not put oil in motor with 

any water present that could 

get into motor.

  Fill to 1 ⁄ 8” over motor plate 

through opening. Use oil fill 

tube that will go into holes so 

that air can escape. replace 

plug (12) and pump is ready 

for operation. Use only high 

grade transformer oil or special 

HydromaTic submersible 

oil in motor.

Pump

Servicing

Performance Curve

Содержание Hydromatic SP50

Страница 1: ...to the owner of the pumping equip ment or to the responsible party who maintains the system OWNER S MANUAL Submersible Sewage Ejector Pumps 2014 Pentair Ltd All Rights Reserved W 03 232 03 27 14 293 WRIGHT STREET DELAVAN WI 53115 WWW HYDROMATIC COM PH 888 957 8677 ...

Страница 2: ...PA 70 2001 Failure to heed above cautions could result in injury or death General Information Pump Warning Note Some city regulations do not allow installing a pump with plastic pipe Check local regulations 5 In applications where the pump may sit idle for months at a time it is recommended that the pump s be cycled every month to ensure the pumping system is working properly when needed 6 Hydroma...

Страница 3: ...3 Pump Installation ...

Страница 4: ...ur oil in container preferably glass so that oil can be observed If oil is clear it will indicate motor is not burned and there has been no water leaking into the motor If oil is cloudy or black it will indicate water in the motor or a burned stator After draining oil remove bolts 10 and remove cord nut 25 from motor cord 21 Remove rubber seal ring from around cord Turn cord and lift up until seal...

Страница 5: ...l after shaft is in place If seal has been chipped it must be replaced Do not replace rotating part of seal until the balance of the pump is assembled 7 Bearings When the pump rotor has been removed check bearings before replacing If bearings are rusted or rough when turned they must be replaced Pull bearings with a bearing puller If puller cannot be replaced over lower bearing remove the outer ra...

Страница 6: ...dy for check run before air testing and filling with oil Plug cord 21 into power receptacle and push up on switch chamber diaphragm 23 to start motor Motor should start and run smoothly When pressure is released on diaphragm motor should stop Repeat operation 2 to 3 times to be sure operation is satisfactory and not binding 9 Air test To air test unit put air fitting in plug opening 12 and charge ...

Страница 7: ...Cord Nut 1 22 14623 010 1 Power Cord 10 1 22 14623 020 1 Power Cord 20 1 23 139 014 1 Ring Seal 1 1 11584 043 4 Nameplate 1 2 14981 001 1 Plug Pipe 1 4 1 3 56 023 2 Motor Housing Includes Handle 1 4 13594 000 1 Motor 200 V three phase 1 4 13595 000 1 Motor 230 or 460 V three phase 1 4 13596 000 1 Motor 575 V three phase 1 5 77 003 1 O Ring Sq cut 1 6 239 005 1 Bolt 2 7 208 000 2 Flange Discharge 1...

Страница 8: ...ute 1 10 203 010 2 Bottom Plate 1 11 614 010 2 Impeller Automatic Manual 1 12 19109A070 Jam Nut 1 13 83 007 1 Seal Shaft 1 14 83 002 1 Seal Assy Stationary 1 15 19099A029 Screw 1 4 20 6 16 51752 404 7 Switch Pressure Ass y Pg 1 17 30 021 1 Screw 1 18 5502 005 1 Bracket Switch 1 19 101 008 1 Screw 4 20 24709110000 Oil Paraffinic 1 21 75 007 1 Cord Nut 1 22 14623 020 1 Power Cord 20 1 23 139 014 1 R...

Страница 9: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Страница 10: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Страница 11: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Страница 12: ... be accepted if received after the Warranty Period has expired This warranty is not transferable EXCEPTIONS Hydromatic Special Application Pumps Battery Back Up Sump Pumps Filtered Effluent Pumps Grinder Pumps and 2 1 2 Sewage Pumps are warranted for a period of 12 months from date of purchase or 18 months from date of manufacture whichever comes first HYDROMATIC SHALL NOT BE LIABLE FOR ANY CONSEQ...

Отзывы: