INSTALLATION
Water Pressure
A minimum of 20 pounds (1.4 bar) of water pressure is
required for regeneration valve to operate effectively.
Electrical Facilities
An uninterrupted alternating current (A/C) supply is required.
NOTE:
Other voltages are available. Please make sure your
voltage supply is compatible with your unit
before installation.
Existing Plumbing
Condition of existing plumbing should be free from lime and
iron buildup. Piping that is built up heavily with lime and/
or iron should be replaced. If piping is clogged with iron,
a separate iron filter unit should be installed ahead of the
water softener.
Location Of Softener And Drain
The softener should be located close to a drain to prevent air
breaks and back flow.
By-Pass Valves
Always provide for the installation of a by-pass valve if unit is
not equipped with one.
CAUTION
Water pressure is not to exceed 125 psi (8.6 bar),
water temperature is not to exceed 110°F (43°C),
and the unit cannot be subjected to
freezing conditions.
Installation Instructions
1. Place the softener tank where you want to install the unit
making sure the unit is level and on a firm base.
2. During cold weather, the installer should warm the valve
to room temperature before operating.
3. All plumbing should be done in accordance with local
plumbing codes. The pipe size for residential drain line
should be a minimum of 1/2 inch (13 mm). Backwash flow
rates in excess of 7 gpm (26.5 Lpm) or length in excess
of 20 feet (6 m) require 3/4 inch (19 mm) drain line.
Commercial drain lines should be the same size as the
drain line flow control.
4. Refer to the dimensional drawing for cutting height of the
distributor tube. If there is no dimensional drawing, cut
the distributor tube flush with the top of the tank.
5. Lubricate the distributor o-ring seal and tank o-ring seal.
Place the main control valve on tank.
NOTE:
Only use silicone lubricant.
6.
IMPORTANT:
For valves equipped with
electromechanical timers and stainless steel meters,
refer to the Meter Dome and Union Orientation section.
7. Solder joints near the drain must be done prior to
connecting the Drain Line Flow Control fitting (DLFC).
Leave at least 6 inch (15 cm) between the DLFC and
solder joints when soldering pipes that are connected on
the DLFC. Failure to do this could cause interior damage
to the DLFC.
8. Plumber tape is the only sealant to be used on the drain
fitting. The drain from twin tank units may be run through
a common line.
9. Make sure that the floor is clean beneath the salt storage
tank and that it is level.
10. Place approximately 1 inch (25 mm) of water above the grid
plate. If a grid is not utilized, fill to the top of the air check
(Figure 1) in the salt tank. Do not add salt to the brine tank
at this time.
11. On units with a by-pass, place in by-pass position. Turn on
the main water supply. Open a cold soft water tap nearby
and let run a few minutes or until the system is free from
foreign material (usually solder) that may have resulted
from the installation. Once clean, close the water tap.
12. Slowly place the by-pass in service position and let water
flow into the mineral tank. When water flow stops, slowly
open a cold water tap nearby and let run until the air is
purged from the unit.
13. Plug unit into an electrical outlet.
NOTE:
All electrical connections must be connected according
to local codes. Be certain the outlet is uninterrupted.
60002 Rev E
Figure 1 Residential Air Check Valve
Содержание FLECK3150 DOWNFLOW
Страница 1: ...waterpurification pentair com FLECK 3150 DOWNFLOW SERVICE MANUAL...
Страница 8: ...8 FLECK 3150 Downflow Service Manual 37 615023200 Rev A 3200 TIME CLOCK TIMER ASSEMBLY 36 38...
Страница 10: ...10 FLECK 3150 Downflow Service Manual 3210 METER DELAYED TIMER ASSEMBLY 41 42 61502 3210 Rev A 40 43...
Страница 30: ...30 FLECK 3150 Downflow Service Manual FLOW DATA INJECTOR DRAW RATES TR20395...