background image

SYSTEM OPERATION IN SERVICE  
(SYSTEM 14-DEMAND RECALL)

The system operates as part of a multi-valve regeneration 

system.
Each valve in the system will have an active flow meter input, 

even in Standby.
The number of valves in service depends on the flow rate.

Examples of a Four-Unit System:

1.  One Valve is in service at all times (the "primary valve").

In Service 

(Primary Tank)

Standby

1

2

3

4

2.  The total flow rate to the primary valve increased past 

the first trip point programmed rate. The flow stayed past 

the trip point delayed time. The next valve (least volume 

remaining) changes from Standby to In Service. This valve 

then splits the total flow between two meters.

In Service

1

2

3

4

Standby

First Trip Point 

(Primary Valve)

Total Flow Split 

Between Two Meters

3.  The flow rate demand decreased below the first trip point. 

The valve returns to Standby.

Standby

Flow Rate Demand 

Below First Trip Point 

(Primary Valve)

1

2

3

4

4.  Total flow rate demand increased past a second trip point 

programmed rate. The second and third valve (least volume 

remaining) changes from Standby to In Service. The total 

flow is split between the three meters.

Standby

Flow Split Between 

Three Meters

1

2

3

4

5.  The third valves returns to stand by as demand decreases 

past the second trip point.

Standby

Flow Split Between 

Two Meters

1

2

3

4

6.  Valves return to stand by due to decreased total flow rate 

and trip points programmed. The valve with the most 

remaining volume will be the first to go into Standby.

Full Capacity 

4th in Standby 

(Primary Valve)

3/4 Capacity 

3rd in Standby

1

2

3

4

1/2 Capacity 

2nd in Standby

1/4 Capacity 

1st in Standby

7.  The primary valve regenerates. The next valve with the least 

remaining volume becomes the new primary valve. The 

valve with the next least volume remaining will be the first 

trip point programmed rate. Valves continue operating in 

this order.

Full Capacity 

4th in Standby

3/4 Capacity 

3rd in Standby

1

2

3

4

1/2 Capacity 

First Trip Point 

Programmed Rate

1/4 Capacity 

New Primary Tank

System Operation in Regeneration:

If two valves are In Service and both reach  

Volume Remaining = 0, the other two valves will shift from 

Standby to In Service. The lead valve with  

Volume Remaining = 0 will start regeneration. The second valve 

with Volume Remaining = 0 will enter Standby. If flow increases 

past the trip point a third valve needs to enter In Service. The 

valve in Standby with Volume Remaining = 0 will shift into 

In Service to maintain a steady flow. Operating for extended 

periods in this mode may degrade the water quality.

Fleck

 3200 NXT • 5

Содержание FLECK NXT TIMER

Страница 1: ...FLECK NXT TIMER SERVICE MANUAL waterpurification pentair com...

Страница 2: ...UPPER 2900S LOWER POWERHEAD ASSEMBLY 13 3150 3900 UPPER LOWER POWERHEAD ASSEMBLY 15 METER ASSEMBLY PLASTIC 17 1 INCH BRASS METER ASSEMBLY 18 1 INCH STAINLESS STEEL METER ASSEMBLY 19 1 1 2 INCH BRASS M...

Страница 3: ...operation CYCLE 1 00 00 00 BACK WASH Example 12 minutes remaining in Cycle 1 Backwash Press the Extra Cycle button during a system queued Regeneration Cycle to immediately advance the valve to the nex...

Страница 4: ...has left Standby and returned to Service When the Regeneration cycle is complete the regenerated unit will enter Standby Standby on each tank is controlled by the lower drive output terminals on the...

Страница 5: ...4 5 The third valves returns to stand by as demand decreases past the second trip point Standby Flow Split Between Two Meters 1 2 3 4 6 Valves return to stand by due to decreased total flow rate and...

Страница 6: ...CHG will be displayed when the lower drive changes from one state to another in dual piston valves INI Initializing INI will display on the screen for 30 to 45 seconds when initializing after a power...

Страница 7: ...e Transformer 1 Locate the ground label to find the screw to attach the ground wire on the transformer 2 Remove the screw and attach the ground wire and re attach the screw 3 Insert white and black tr...

Страница 8: ...nges press the Diagnostic button NOTE If no keypad activity is made for 5 minutes while in the Master Programming Mode or if there is a power failure no changes will be saved and the unit will go back...

Страница 9: ...time NOTE In U S Gallons mode the display will be in 12 hour time UNIT CAPACITY 00000000 GRAINS Options Grains in U S Format Default Grams in Metric Format Example Grains Default NOTE Use the Shift b...

Страница 10: ...nse 1 Hour Backwash 10 Minutes UF Fill First Brine Tank Fill 12 Minutes Brine Making 1 Hour Regenerant Flow Cycle 3 Time Cycle 4 Time Downflow Rapid Rinse 10 Minutes Brine Tank Fill 12 Minutes UF Brin...

Страница 11: ...ate at this time Example Peak flow since last regeneration Example Gallons at the outlet since installation Example Hours between the last regeneration and the one before it Example Hours since last r...

Страница 12: ...Start c c c c c c c c c c c c c c c c c c c c c Aux Relay Output End c c c c c c c c c c c c c c c c c c c c c Chemical Pump x x x x x x u u x x x x x x x x CPO Aux Relay Volume c c c c c c c c c c c...

Страница 13: ...ERHEAD ASSEMBLY 37 35 31 41 39 32 19 7 6 30 36 32 40 20 38 33 22 52 12 21 13 44 16 14 15 14 17 16 46 25 16 26 1 42 23 46 2 11 4 3 5 6 7 10 19 32 28 29 18 6 11 43 9 8 32 24 61501 3200NXT 2_Page2_REVA 2...

Страница 14: ...e 27 1 60217 02 Cover Assy 2900 Lower Black Environmental 28 1 18626 Spacer Indicator 29 1 18746 Bearing Connecting Rod 30 2 11224 Screw Hex Hd 5 16 18 X 5 8 Ss 31 1 10250 Ring Retaining 32 7 10872 Sc...

Страница 15: ...5 9 27 26 11 46 7 8 12 6 47 40 42 4 11 45 15 25 35 16 43 23 44 18 17 20 21 22 31 23 27 26 11 10 8 13 12 11 19 15 25 17 16 24 34 9 14 28 29 32 28 38 30 50 24 28 49 32 52 37 48 23 31 22 21 20 18 33 52 3...

Страница 16: ...0VA 41049 Transformer Euro 230V 24V 108VA 41050 Transformer Aust 230V 24V 108VA 36 1 19121 Meter Cable Assembly 19121 08 Meter Cable Assembly 35 inch long with connector 19121 09 Meter Cable Assembly...

Страница 17: ...1 1 2 BSP Plastic w O Ring 20 61560 Meter Assy 1 1 2 INLN ELEC PLAS w o Nipples TURB 61560 01 Meter Assy 1 INLN NPT ELEC PLAS PLAS Nipples TURB 61560 02 Meter Assy 1 INLN BSP ELEC PLAS PLAS Nipples T...

Страница 18: ...r 1 9 1 13287 O ring 123 10 1 14961 10 Fitting 1 Quick Connector BSP 11 1 14962 Nut Quick Connect NPT 12 1 60613 Meter Assy 1 Inline NPT Electronic Brass PDL 60613NP Meter Assy 1 Inline NPT Electronic...

Страница 19: ...tended Range 1 61932 20 Meter Assy 1 inch Inline Stainless Steel BSP Standard Range 1 61932 21 Meter Assy 1 inch Inline Stainless Steel BSP Extended Range 3 1 44022 Union 1 inch NPT Optional on models...

Страница 20: ...12 1 60614 Meter Assy 1 1 2 Inline NPT Electronic Brass Body PDL 60614NP Meter Assy 1 1 2 INLN NPT ELEC BRS BDY NP PDL 60614 01 Meter Assy 1 1 2 INLN NPT ELEC BRS BDY PDL 1 SLV 60614 01NP Meter Assy...

Страница 21: ...1 2 inch Inline Stainless Steel BSP Standard Range 1 61933 21 Meter Assy 1 1 2 inch Inline Stainless Steel BSP Extended Range 3 1 44024 Union 1 1 2 inch NPT Optional on models with electronic controls...

Страница 22: ...NP Fitting Nipple 2 BSP Brass NP 14 1 14679 O ring 227 15 1 14569 Nut Quick Connect 16 60615 Meter Assy 2 INLN NPT ELEC BRS PDL 1 5 SLV 60615NP Meter Assy 2 INLN NPT ELEC NP PDL 1 5 SLV 60615 20 Meter...

Страница 23: ...el BSP Standard Range 1 61934 21 Meter Assy 2 inch Inline Stainless Steel BSP Extended Range 3 1 44026 Union 2 inch NPT Optional on models with electronic controls 1 44027 Union 2 inch BSP Optional on...

Страница 24: ...Flow Straightener 11 8 40118 Screw SCKT HD 1 2 13 UN 12 8 16386 Nut Hex Jam 1 2 13 18 8 S S 13 6 12473 Screw Hex Washer Head 10 24 x 0 625 14 60617 Meter Assy 3 INLN NPT Electronic BRS BDY Paddlewhee...

Страница 25: ...ange 61935 11 Meter Assy 3 Inch Inline Stainless Steel NPT Extended Range 61935 20 Meter Assy 3 Inch Inline Stainless Steel BSP Standard Range 61935 21 Meter Assy 3 Inch Inline Stainless Steel BSP Ext...

Страница 26: ...NAL SOLENOID VALVE ON DURING REGENERATION OR STANDBY P6 OUTPUT 24VAC 50 60Hz 0 25 A MAX OPTIONAL INTERLOCK SWITCH N O UNSWITCHED HOT 24VAC 3A MAX RESISTIVE 30VDC 3A MAX RESISTIVE NEUTRAL SWITCHED HOT...

Страница 27: ...H N O 24VAC 3A MAX RESISTIVE 30VDC 3A MAX RESISTIVE SWITCHED HOT BLACK ORANGE RED WHITE BLACK C N O N C SW 4 GREEN LDCAM LDM RED BLACK WHITE GREEN LOWER DRIVE UPPER DRIVE BLACK RED GREEN OPTIONAL MOTO...

Страница 28: ...WHITE STRIPE RED WHITE STRIPE GREEN WHITE STRIPE WHITE BLACK STRIPE RED BLACK STRIPE BLUE BLACK STRIPE BLUE WHITE STRIPE GREEN 3 19 13 14 2 8 17 15 12 11 1 18 16 4 5 CONNECTOR FRONT VIEW BELDEN 9458...

Страница 29: ...DM 13 14 15 16 17 18 19 12 11 10 9 8 4 5 6 7 1 2 3 BLK TAN PINK BLUE HOME P N 19781 NOT USED UDM LINE RED BLACK BLACK IC1 RED GREY METER STEP AUX LDM WHITE GREEN WHITE RED BLACK 5 VDC BLACK NOT USED 9...

Страница 30: ...T NEUTRAL 250VAC 3A MAX RESISTIVE 30VDC 3A MAX RESISTIVE HCAM SCAM C N O N C SW1 C N O N C SW2 UDM 13 14 15 16 17 18 19 12 11 10 9 8 4 5 6 7 1 2 3 LDM LDCAM C N O N C SW4 BLK TAN PINK BLUE HOME P N 19...

Страница 31: ...EUTRAL 250VAC 3A MAX RESISTIVE 30VDC 3A MAX RESISTIVE BLACK P N 19781 9 6 3 FLOW METER 5 VDC DC GROUND 7 8 4 1 5 2 OPTIONAL SHIELD TB2 ORANGE OPTIONAL OPTIONAL SENSOR INPUT METER INPUT GREEN RED LOCKO...

Страница 32: ...50VAC 3A MAX RESISTIVE 30VDC 3A MAX RESISTIVE P N 19781 9 6 3 FLOW METER 5 VDC DC GROUND 7 8 4 1 5 2 OPTIONAL SHIELD TB2 ORANGE OPTIONAL OPTIONAL SENSOR INPUT METER INPUT GREEN RED LOCKOUT INPUT SENSO...

Страница 33: ...valve address number Program each unit with unique valve address number in Master Programming Detected Error Program Mismatch Master program parameters do not match between two or more controls Confi...

Страница 34: ...34 Fleck 3200 NXT...

Страница 35: ...Fleck 3200 NXT 35...

Страница 36: ...RPURIFICATION PENTAIR COM CUSTOMER CARE 800 279 9404 tech support pentair com For a detailed list of where Pentair trademarks are registered please visit waterpurification pentair com brands Pentair t...

Отзывы: