Installer manual Fleck 9100 SXT - Commissioning
Ref. MKT-IM-004 / E - 06.10.2020
61 / 108
Do not let the disinfectant stand for more than 3 hours in the brine tank before the regeneration
start.
Dosage
Measure two grains ~ 0.11 mL for 1 L.
Brine tank softeners
Backwash the softener and add the required amount of hypochlorite to the well of the brine tank.
The brine tank should have water in it to permit the chlorine solution to be carried into the
softener.
Proceed with the normal regeneration.
7.2.3
Electro chlorination
Valves or systems already equipped with an electrochlorinator device or system will be sanitized
during the brine draw phase.
Содержание FLECK 9100 SXT
Страница 1: ...www pentairaquaeurope com INSTALLER MANUAL FLECK 9100 SXT COMMERCIAL...
Страница 16: ...Installer manual Fleck 9100 SXT Description 16 108 Ref MKT IM 004 E 06 10 2020 3 3 Outline drawing...
Страница 73: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 73 108...
Страница 75: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 75 108...
Страница 77: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 77 108...
Страница 80: ...Installer manual Fleck 9100 SXT Maintenance 80 108 Ref MKT IM 004 E 06 10 2020...
Страница 82: ...Installer manual Fleck 9100 SXT Maintenance 82 108 Ref MKT IM 004 E 06 10 2020...
Страница 84: ...Installer manual Fleck 9100 SXT Maintenance 84 108 Ref MKT IM 004 E 06 10 2020...
Страница 87: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 87 108...