Pentair 188623 Скачать руководство пользователя страница 19

FULLFLO

XF

® 4000-SERIES Grid Style D.E. Filter Installation and User’s Guide

15

43.14”

21”

2.98”

59.47”

TECHNICAL DATA

Head Loss Comparison Curve

Recommended Flow Rates

Dimensional Drawings

FullFloXF 4000-Series Grid Style D.E. Filter 

Model

P/N

Filter Area 

sq. ft.

Vertical Clearance 

Required

Flow Rate 

GPM

Res. Turnover Capacity (Gallons)

8 hrs.

10 hrs.

12 hrs.

XF4048

188623

48

65”

96

45,120

56,400

67,680

XF4060

188624

60

84”

120

55,680

69,600

83,520

XF4072

188625

72

84”

144

69,120

86,400

103,680

0

2

4

6

8

10

12

0

20

40

60

80

100

120

140

160

Pressure (psi

)

Flow (GPM)

Содержание 188623

Страница 1: ...reat force To reduce the risk of severe injury or death relieve pressure by opening air relief valve before opening filter Before starting the pump after servicing ensure that clamp band is correctly...

Страница 2: ...cannot be switched on while you are working on the pool equipment Failure to do so could result in serious injury or death to serviceman pool users or others due to electric shock Positionthefilteran...

Страница 3: ...and pump during system start up shut down or servicing of the system filter General Installation Information The following information should be read carefully since it outlines the proper manner of...

Страница 4: ...ation System Start Up and Operation Opening the Filter Preparing Diatomite Coating Filter Elements with D E Valve Operation Installing the Filter Lid and Clamp Ring Start Up Instructions TABLE OF CONT...

Страница 5: ...ximum pressure stated on each component of the system 4 The pressure gauge is the primary indicator of how the filter is operating Maintain your pressure gauge in good working order refer to Maintaini...

Страница 6: ...emove the filter lid for cleaning and servicing This distance will vary with the model of filter you are using See Table 1 for the required vertical clearance 6 Position the filter to safely direct wa...

Страница 7: ...ressure gauge connection threads with thread seal tape two full wraps of tape will be enough 6 Thread the pressure gauge into the top of the manual air relief valve Hand tighten only 7 Follow Start up...

Страница 8: ...priate size concrete anchor to mount the clamp to the equipment pad Be sure to follow local codes 3 Fit the hook of each clamp into the anchor slots on the base panel of the filter See Figure 3 4 Mark...

Страница 9: ...y to prevent the lid from separating during system start up operation or servicing REQUIRED TOOLS Ratchet Wrench 7 8 Socket Socket Extender if needed PROCEDURE 1 Shut off pump and relieve pressure a T...

Страница 10: ...with sufficient water in a bucket to make a thin milky mixture 3 Refer to Coating the Filter Elements with D E for instruction on introducing the diatomite slurry into the filter Follow all manufactur...

Страница 11: ...clamp to fit the clamp properly c Continue to tighten until the spring coils touch d Tap around the entire clamp again and verify the spring coils remain touching If not continue to tighten the nut N...

Страница 12: ...vice at 800 831 7133 for assistance 5 After a steady stream of water appears close the manual air relief valve by turning the valve cover assembly a quarter turn clockwise 6 The first time the system...

Страница 13: ...cannot assume any responsibility for torn or damaged bags if left in the sun to dry 10 If your filtration system contains a Separation Tank follow the instructions in Cleaning the Separation Tank on p...

Страница 14: ...are present a Soak the filter element for at least one hour overnight is most effective in one of the following A commercial filter cleaner One cup trisodium phosphate TSP to five gallons of water On...

Страница 15: ...O ring is properly seated around the entire tank to prevent pinching 9 Install the clean bag in tank with the rim of the bag immediately below the tank inlet opening then push down on the rim opposit...

Страница 16: ...ution Allow the elements to soak in the solution for 10 minutes or until bubbling stops 5 Turn the elements over placing the top halves into the solution Allow the top halves of the elements to soak f...

Страница 17: ...manual air relief valve by turning the valve cover assembly a quarter turn counter clockwise until it snaps into the full open position c Stand clear of the filter and wait until all pressure is relie...

Страница 18: ...on filter elements Clean the filter elements according to Manually Cleaning the Filter Elements page 10 and or Acid Soaking the Filter Elements page 12 Cloud of Dirt Entering Pool A brief cloud of di...

Страница 19: ...rawings FullFloXF 4000 Series Grid Style D E Filter Model P N Filter Area sq ft Vertical Clearance Required Flow Rate GPM Res Turnover Capacity Gallons 8 hrs 10 hrs 12 hrs XF4048 188623 48 65 96 45 12...

Страница 20: ...nd approved by Pentair and original Pentair parts you simultaneously acquire the assurance that they have been thoroughly tested by Pentair to ensure optimum performance when installed on your filter...

Страница 21: ...FULLFLOXF 4000 SERIES Grid Style D E Filter Installation and User s Guide 17 NOTES...

Страница 22: ...FULLFLOXF 4000 SERIES Grid Style D E Filter Installation and User s Guide 18 NOTES...

Страница 23: ...FULLFLOXF 4000 SERIES Grid Style D E Filter Installation and User s Guide 19 NOTES...

Страница 24: ...r trademarks and logos are property of Pentair Third party registered and unregistered trademarks and logos are the property of their respective owners Because we are continuously improving our produc...

Отзывы: