background image

ENGLISH

You have purchased a product made by Pentair Jung Pum-

pen and with it, therefore, also excellent quality and service. 

Secure this service by carrying out the installation works 

in accordance with the instructions, so that our product 

can perform its task to your complete satisfaction. Please 

remember that damage caused by incorrect installation or 

handling will adversely affect the guarantee. 
This appliance can be used by children aged 8 years or over 

and by persons with limited physical, sensory or intellectual 

capabilities, or with limited experience and knowledge, pro-

vided that they are supervised or have been instructed in 

the safe use of the appliance and are aware of the dangers 

involved. Children must not be allowed to play with the ap-

pliance. Cleaning and user maintenance must not be carried 

out by children unless they are supervised.

Damage prevention in case of failure

Like any other electrical device, this product may fail due to a 
lack of mains voltage or a technical defect.
If damage (including consequential damage) can occur as a re-
sult of product failure, the following precautions can be taken 
at your discretion:

   

Installation of a water level dependent (under circumstan-

ces, mains-independent) alarm system, so that the alarm 
can be heard before damage occurs.

   

Inspection of the collecting tank/chamber for tightness up 

to the top edge before – or at the latest, during – installation 
or operation of the product.

   

Installation of backflow protection for drainage units that can 
be damaged by wastewater leakage upon product failure.

   

Installation of a further product that can compensate in 

case of failure of the other product (e.g. duplex unit).

   

Installation of an emergency power generator.

As these precautions serve to prevent or minimise conse-
quential damage upon product failure, they are to be strictly 
observed as the manufacturer’s guideline – in line with the 
standard DIN EN specifications as state of the art – when using 
the product (Higher Regional Court Frankfurt/Main, Ref.: 2 U 
205/11, 06/15/2012).

SAFETY INSTRUCTIONS

This instruction manual contains essential information that 
must be observed during installation, operation and servic-
ing. It is therefore important that the installer and the respon-
sible technician/operator read this instruction manual before 
the equipment is installed and put into operation. The manual 
must always be available at the location where the pump or the 
plant is installed. 
Failure to observe the safety instructions can lead to the loss 
of all indemnity.
In this instruction manual, safety information is distinctly la-
belled with particular symbols. Disregarding this information 
can be dangerous.

  General danger to people

  Warning of electrical voltage

NOTICE! 

Danger to equipment and operation 

Qualification and training of personnel

All personnel involved with the operation, servicing, inspection 
and  installation  of  the  equipment  must  be  suitably  qualified 
for this work and must have studied the instruction manual in 
depth to ensure that they are sufficiently conversant with its 
contents. The supervision, competence and areas of responsi-
bility of the personnel must be precisely regulated by the ope-
rator. If the personnel do not have the necessary skills, they 
must be instructed and trained accordingly.

Safety-conscious working

The safety instructions in this instruction manual, the existing 
national regulations regarding accident prevention, and any 
internal working, operating and safety regulations must be ad-
hered to.

Safety instructions for the operator/user

All legal regulations, local directives and safety regulations 
must be adhered to.
The possibility of danger due to electrical energy must be pre-
vented. 
Leakages of dangerous (e.g. explosive, toxic, hot) substances 
must be discharged such that no danger to people or the envi-
ronment occurs. Legal regulations must be observed.

Safety instructions for installation, inspection and mainte-
nance works

As a basic principle, works may only be carried out to the equip-
ment when it is shut down. Pumps or plant that convey harmful 
substances must be decontaminated.
All safety and protection components must be re-fitted and/or 
made operational immediately after the works have been com-
pleted. Their effectiveness must be checked before restarting, 
taking into account the current regulations and stipulations.

Unauthorised modifications, manufacture of spare parts

The equipment may only be modified or altered in agreement 
with the manufacturer. The use of original spare parts and 
accessories approved by the manufacturer is important for 
safety reasons. The use of other parts can result in liability for 
consequential damage being rescinded.

Unauthorised operating methods

The operational safety of the supplied equipment is only guar-
anteed if the equipment is used for its intended purpose. The 
limiting values given in the "Technical Data" section may not be 
exceeded under any circumstances.

Instructions regarding accident prevention 

Before commencing servicing or maintenance works, cordon 
off the working area and check that the lifting gear is in perfect 
condition.
Never work alone. Always wear a hard hat, safety glasses and 
safety shoes and, if necessary, a suitable safety belt. 
Before carrying out welding works or using electrical devices, 
check to ensure there is no danger of explosion.
People working in wastewater systems must be vaccinated 
against the pathogens that may be found there. For the sake of 
your health, be sure to pay meticulous attention to cleanliness 
wherever you are working.
Make sure that there are no toxic gases in the working area.
Observe the health and safety at work regulations and make 
sure that a first-aid kit is to hand.
In some cases, the pump and the pumping medium may be hot 
and could cause burns. 

2

Содержание OXYLIFT 2

Страница 1: ...JUNG PUMPEN DE B 41539 30 1810 EN Instruction Manual OXYLIFT2...

Страница 2: ...g of personnel All personnel involved with the operation servicing inspection and installation of the equipment must be suitably qualified for this work and must have studied the instruction manual in...

Страница 3: ...o the plug this can cause malfunctions and damage Observe the operating voltage see the type plate No additional motor protection is required since the system has an integrated winding thermostat Inad...

Страница 4: ...levered off The impeller can now be cleaned through the suction opening QUICKTIPSFORREMEDYING FAULTS Pump does not work Check mains current do not use a pin gauge Fuse faulty may be too weak please re...

Страница 5: ...xylift 2 S kg 4 4 1 mm 15 P1 W 300 P2 W 200 U V 1 N PE 230 f Hz 50 I A 1 3 n min 1 2720 Leistung Performance Puissances H m 1 2 3 4 5 Q m h 8 7 6 4 2 Technische Daten Technical Data Caract ristiques t...

Страница 6: ...d Oxylift 2 JP46921 Oxylift 2S JP46922 Leitung Cable 1 5 m JP46925 4 m JP46926 10 m JP45084 20 m JP46927 Schwimmer Float JP42771 Schaltwelle Shift shaft JP42770 Haube Top cover Oxylift 2 JP46928 Oxyli...

Страница 7: ...ised standards FI Direktiivi Yhdenmukaistettu standardi FR Directives Normes harmonis es HU Ir nyelve Harmoniz szabv nyok IT Direttive Norme armonizzate NL Richtlijnen Geharmoniseerde normen PL Dyrekt...

Страница 8: ...Pump Technical Services Limited Pump House Unit 12 Bilton Road Industrial Estate Erith Kent DA8 2AN Tel 01322 357 080 Fax 01322 341 341 Email sales pts jung co uk...

Отзывы: