background image

14 

14

Anchoring the Tub – “Peninsula Installation” (1 Wall – Side) 

This anchoring procedure describes the steps for anchoring the tub in a single wall type 
installation as shown in figure 1 under “Peninsula Installation - 1 Wall - Side”. 
 

1.

 

Follow the steps for anchoring the tub under “Anchoring the tub – “Alcove Installation” (2 or 3 

Walls)” 

2.

 

Install an additional anchor into the floor just inside the access door on the side opposite from 

the wall. 

 
 
Electrical Connections 

This unit is to be connected only by a licensed electrician.  A minimum of 15 amp 120 volt 
service is required with ground fault circuit interrupter. 
 

  

Warning: Ensure that the power supply is turned off before 

attempting to connect to the tub. Failure to do this could result in injury or 
death to the installer. 
 

1.

 

Remove the cover from the small field wiring junction box mounted to the tub frame. It is 
located inside the access door on the right side of the tub and below the larger electrical box.  

2.

 

Connect the electrical supply conduit to the small field wiring junction box top. 

3.

 

Connect the line wire (normally black) to the black wire of the tub. Connect the neutral wire 
(normally white) to the white wire of the tub. Connect the ground wire (normally green or 
yellow & green) to the green and yellow wire of the tub. These connections can be made with 
wire nuts. 

4.

 

Push the wires back into the box and replace the lid. 

5.

 

Turn ON the power to the tub. 

6.

 

Turn ON the tub’s circuit breaker located on the top of the larger electrical box. That box is 
mounted to a sliding “drawer” that can be pulled out through the access door opening.  

7.

 

If the blower motor starts running, find the “Aqua-Aire ON/OFF” button on the control panel 
of the tub and press it once to turn off the blower. 

8.

 

Switch the tub’s circuit breaker, located on the top of the electrical box, to the OFF position. 

 

Water Supply and Drain Connections: 

Note: It is highly required that a licensed plumber make the final connections of the hot 
and cold water supply and the connection to the drain. 

 
1.

 

Connect the supply hoses (hot and cold water supply) to the respective ports on the tub. 
Ensure that there are sealing gaskets within the swivel fittings on the hoses. 

2.

 

Connect the drain (waste) of the tub to the facility’s drain system. 

3.

 

Close the water door of the tub, place the drain plug into the drain, and open the facility’s 
supply valves to the tub and check for leaks. 

Содержание Cascade Alcove

Страница 1: ...a NE 68818 360745A Revision A 10 26 07 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersales hamilton net Web Site www pennercareinc com ALCOVE with AQUA AIRE Installation Assembly In...

Страница 2: ...9 HOT AND COLD WATER SUPPLY REQUIREMENTS 10 ELECTRICAL REQUIREMENTS 10 UNPACKING THE TUB 12 WATER SUPPLY HOSE CONNECTIONS 11 ANCHORING THE TUB ALCOVE INSTALLATION 2 OR 3 WALLS 11 ANCHORING THE TUB PEN...

Страница 3: ...n the tub Meaning Safety warning Failure to understand and obey this warning may result in injury to you or to others Meaning Failure to follow these instructions may cause damage to parts or systems...

Страница 4: ...4 4 Figure 3 Basic Dimensions Cascade Alcove...

Страница 5: ...select the best method of connection and if Reduced Pressure Zone Backflow Preventers are required Rough in Specifications Alcove Installation 2 or 3 walls and Peninsula Installation 1 wall end Figur...

Страница 6: ...igure 5 Rough in Specifications Peninsula Installation 1 wall Side plumbing from the floor Reference figure 1 Figure 6 Rough in Specifications Peninsula Installation 1 wall Side plumbing from the back...

Страница 7: ...ree different options for roughing in the drain pipe from the floor from the side wall and from the back wall The connections for those two options are shown in figures 7 8 It is required that a licen...

Страница 8: ...8 8 Figure 8 Drain pipe from the wall...

Страница 9: ...supply pressure 145 PSI Maximum dynamic maintained supply pressure 81 PSI Maximum supply Hot water temperature Consult local requirements for maximum allowed supply temperatures Not recommended over...

Страница 10: ...o place Then connect the conduit to the tub s field wiring box and make the final wiring connections after the tub is in place A licensed electrician is required to make all electrical connections Fig...

Страница 11: ...or pipe sealant to make the male thread connections The supply hose to tub connection uses a gasket to make the seal so no thread tape or sealant is needed Note Two inch female x female couplers have...

Страница 12: ...e block or whatever it might be Counter sink or counter bore the anchors into the wood to ensure that the anchors do not protrude out from the surface of the anchor board 4 Carefully slide the tub int...

Страница 13: ...ected to the supply valves 2 If the drain connection is to be made with a rubber coupler it may need to be in place loosely on the drain pipe prior to moving the tub into place 3 Carefully slide the t...

Страница 14: ...wire of the tub Connect the neutral wire normally white to the white wire of the tub Connect the ground wire normally green or yellow green to the green and yellow wire of the tub These connections c...

Страница 15: ...on as long as you push and hold the buttons 7 If any leaks are found tighten the connection to stop the leak 8 Open the tub drain and check the drain system for any leaks and fix if needed 9 Slide the...

Страница 16: ...ur nearest distributor contact PENNER PATIENT CARE INC Box 523 102 Grant St Aurora NE 68818 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersales hamilton net Web Site www pennercarei...

Отзывы: