Pella 80KM0103 Скачать руководство пользователя страница 6

SEALING THE DOOR TO THE EXTERIOR WALL CLADDING

Note: When applying the casing bead for stucco, leave 1/2" space between the 
head of the door and the casing bead, and 3/8" space between the door jambs 
and the casing bead for backer rod and sealant. Refer to the illustration 
(Southwestern Wall With Stucco). 

Note: The sealant details shown are standard recommendations from the 
sealant industry. Contact your sealant supplier for recommendations and 
instructions for this and any other application.

A. 

Install the hardware.

2EFERTOTHEINSTRUCTIONSINCLUDEDINTHEHARDWAREBOX

B. 

Insert backer rod

INTOTHESPACEAROUNDTHEDOORLEAVINGATLEASTA

CLEARANCEBETWEENTHEBACKERRODANDTHEEXTERIORFACEOFTHECASINGBEAD

Note: Backer rod adds shape and depth for the sealant line.

C. 

Apply a bead of high quality exterior grade sealant

 

to the entire perimeter of the door. At each end of the 
bottom of the door, insert sealant into the spaces between 
the bottom of the door and the sill support and connect 
it to the perimeter sealant.

D. 

Shape, tool and clean excess sealant. 

7HENlNISHED

the sealant should be the shape of an hourglass.

Note: This method creates a more flexible sealant 
line capable of expanding and contracting.

E. 

Remove plastic guards

 at the base of the door 

once construction is complete.

4065)8&45&3/

8"--

8*5)

456$$0

$MFBSBODF

#BDLFS3PEBOE

4FBMBOUUZQJDBM

*OTVMBUJOH

'PBN

"DDFTTPSZ

(SPPWF

x

INTERIOR FINISHING

)FTHEPRODUCTSCANNOTBElNISHEDIMMEDIATELYCOVERWITHCLEARPLASTICTOPROTECTFROMDIRTDAMAGEANDMOISTURE2EMOVEANYCONSTRUCTION
RESIDUEBEFORElNISHING3ANDALLWOODSURFACESLIGHTLYWITHGRITORlNERSANDPAPER$/./4USESTEELWOOL"%#!2%&5,./44/
3#2!4#(4(%',!332EMOVESANDINGDUST

0ELLAPRODUCTSMUSTBElNISHEDPERTHEBELOWINSTRUCTIONSFAILURETOFOLLOWTHESEINSTRUCTIONSVOIDSTHE,IMITED7ARRANTY
s/NCASEMENTANDAWNINGSITISOPTIONALTOPAINTSTAINORlNISHTHEVERTICALANDHORIZONTALSASHEDGES
s/NSINGLEHUNGANDDOUBLEHUNGDONOTPAINTSTAINORlNISHTHEVERTICALSASHEDGESANYlNISHONTHEVERTICALSASHEDGESMAYCAUSETHESASH
TOSTICKITISOPTIONALTOPAINTSTAINORlNISHTHEHORIZONTALSASHEDGES
s/NPATIODOORSITISOPTIONALTOPAINTSTAINORlNISHTHEVERTICALANDHORIZONTALPANELEDGES

Note: To maintain proper product performance do not paint, finish or remove the weather-stripping, mohair dust pads, gaskets or vinyl 
parts. Air and water leakage will result if these parts are removed. After finishing, allow venting windows and doors to dry completely 
before closing them.

0ELLA#ORPORATIONISNOTRESPONSIBLEFORINTERIORPAINTANDSTAINlNISHIMPERFECTIONSFORANYPRODUCTTHATISNOTFACTORYAPPLIEDBY0ELLA
#ORPORATION5SEOFINAPPROPRIATElNISHESSOLVENTSBRICKWASHORCLEANINGCHEMICALSWILLCAUSEADVERSEREACTIONSWITHWINDOWANDDOOR

materials and voids the Limited Warranty.

&ORADDITIONALINFORMATIONONlNISHINGSEETHE0ELLA/WNERS-ANUALORGOTO

 www.pella.com.

Содержание 80KM0103

Страница 1: ...QUALITY EXTERIOR GRADE POLYURETHANE OR SILICONE SEALANT TO TUBES PER DOOR s REAT 3TUFF Window and Door Insulating Foam Sealant by the Dow Chemical Company or equivalent low pressure polyurethane windo...

Страница 2: ...of the ashing paper with the inside edge of the trimmer JACK STUD AND CENTER THE mASHING PAPER WITH THE HEIGHT OF THE ROUGH OPENING 3TAPLE the ashing paper to the trimmer E Apply bottom ashing tape 1...

Страница 3: ...HE BUILDING 4 SLIDE THE BOTTOM OF the door into the opening Sliding will damage the sealant lines Place the bottom of the door at the bottom of the opening then tilt the top into position Center the d...

Страница 4: ...ng L Check door operation PEN AND CLOSE THE DOOR TO CHECK FOR PROPER OPERATION AKE SURE THE DOOR WILL LATCH CORRECTLY Note If there are any problems with the operation recheck and adjust the reveal M...

Страница 5: ...of the ashing paper ush with the frame of the door and center the ashing paper with the door Staple the ashing paper to the header Note When applying the rst layer of building felt ensure the sill ash...

Страница 6: ...JDBM OTVMBUJOH PBN DDFTTPSZ SPPWF x x 6 INTERIOR FINISHING F THE PRODUCTS CANNOT BE lNISHED IMMEDIATELY COVER WITH CLEAR PLASTIC TO PROTECT FROM DIRT DAMAGE AND MOISTURE 2EMOVE ANY CONSTRUCTION RESIDU...

Страница 7: ...ding the use of Pella products as well as the design and installation of ashing and sealing systems are the responsibility of the Buyer or User the architect contractor installer or other construction...

Отзывы: