![pela tools 506475 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/pela-tools/506475/506475_manual_1522334023.webp)
Install the lift arms.
Remove the locking ring for the stays that hold the
arms in place and lift out the stays on both sleds (4
pcs).
The arms are the same length. The location is
determined depending on the mounting holes for
the foot guards. The foot guards must be mounted
outwards and with the angle upwards.
Lift your arms into place and secure with the stays.
Do not forget to replace the locking rings.
To facilitate the
assembly of the lifting
arms, you can
temporarily loose a
bit on the allen screws
for the ring lock.
Mount the foot guards on the lifting arms with the
allen screws. The foot guards must be mounted
outwards and with the angle upwards. See picture
below.
Check the locking of the arms, make sure that
the ring lock fit properly. Mount the lifting pads by
screwing them into the threaded holes on the lifting
arms and securing them with a locking ring.
Install handles and covers for safety catch
• Install the handle on the main pillar.
• Install the cover on the main column.
• Install the black ball on the handle.
• Cut off excess wire on the second pillar.
• Fit the cover.
Содержание 506475
Страница 1: ...Two post lift Tv pelarlyft med fritt golv Item No 506475...
Страница 12: ...Vajerdragning...
Страница 13: ......
Страница 27: ......
Страница 28: ......
Страница 32: ...Verktygsboden Erfilux AB K llb cksrydsgatan 1 SE 507 42 Bor s Verktygsboden Bor s Sweden 0120504 03...