PEERLESS PVF Series Скачать руководство пользователя страница 7

Code

Example

Designation

D

Tornatech

E

Master

F

Cutler Hammer

X

Special

3

. Receiving the product

3

.1

 

Unpacking the product

Do not unpack more than required to verify that the equipment is

 

complete and undamaged unless installed immediately. Look

 

through all packaging material that is to be discarded to ensure no

 

parts or instructions are discarded accidentally. In some shipments,

 

small boxes containing additional parts are bound to pump skids.

 

Leave small parts in their shipping container until installation. While

 

unpacking, make sure that pump unit accessories are clearly

 

marked indicating the exact pump unit they should be used with.

3

.2

 

Transporting the product

The pump has been prepared for shipment at the factory so as to

 

minimize potential damage due to handling and transport.

WARNING

Crushing hazard

Death or serious personal injury

Make sure all persons stand clear of the load and the
lifting equipment while product is lifted, lowered,
loaded and unloaded. Do not allow anyone to stand
on, under, or near the load.

Do not subject the pump to excessive g-forces during
handling or transport.

3

.3

 

Inspecting the product

The product must be inspected after transport and before

 

installation.
To complete the inspection, follow the steps below:
1.

Check the product for transport damage. Contact the
transporter immediately in case of damage.

2.

Check that the delivered products correspond to the order.

3.

Check the positions and sizes of fittings. Retighten
connections, as they may have become loose during transport.

4.

Note the extent of damage or shortage on the freight bill and
bill of lading. Failure to note damage or missing parts may
result in declined warranty or replacement of parts.

5.

Identify and properly store all pump components until ready for
installation.

3

.4

 

Scope of delivery

A typical shipment will include:

one skid with the fire pump and the driver mounted on the base
plate

one skid with the controller and accessories, if any

installation and operating instructions.

Refer to the original order in case of questions about shipping, for

 

example, special arrangements with third-party vendors for shipping

 

and storage.

3

.5

 

Handling and storing the product after delivery

Standard factory packaging is suitable for protection during

 

shipment and during covered storage at a job site for a short period

 

between installation and startup. The preservatives applied at the

 

factory have an effective life of two to three months from the date of

shipment from the factory, depending on the severity of the
environment. For international destinations this will vary depending
on the seaworthiness of the product's export packaging.

Related information

4

.5.1 Rigging and lifting

 

7

.1 Storage

7

.2 Handling the product

4

. Installing the product

4

.1

 

Factory support

For Engineered to Order (ETO) products, Peerless
Pump recommends that you invite a Peerless Pump service

 

engineer to supervise the installation and startup to ensure a proper

 

installation. Peerless Pump recommends that you review the

 

instructions provided with the pump.

WARNING

Chemical hazard 

Death or serious personal injury

This pump unit is designed to be operated within
certain limits pertaining to fluid pump, driver conditions,
etc. These limits are listed on the performance curve,
or on original contract documentation.

Do not operate this pump at any pressure, flow rate, or
liquid temperature other than those for which the pump
was originally purchased. Do not pump any other liquid
than the one for which the pump was originally
purchased without the consent of Peerless Pump or its
authorized representatives. Disregarding this warning
can result in pump failure and serious personal injury
or death. 

Operation outside of these limits may result in damage
to the unit, personal injury, or death. Consult your
Peerless Pump representative for approval if a need
arises to operate outside of these limits.

Operation at a reduced capacity for prolonged periods
may shorten the useful life of the seals or packing, shaft
sleeves, bearings, and the shaft. Fire pumps are applied
with full knowledge that operation at reduced capacity will
occur.

4

.2

 

Location

Locate pump inlet and outlet pipes as well as auxiliary
equipment, control and starting panels so as to provide
adequate floor space and working room for access and
ease of maintenance.

To minimize frictional head loss, locate the pump so that it
can be installed with a short and direct outlet pipe and the
minimum number of elbows and fittings. If practical, locate
the pump that it will be accessible for inspection during
operation. Protect pumps, drivers and controls against
damage from flooding, freezing, etc.

9

English (US)

Содержание PVF Series

Страница 1: ...PVF Vertical inline single stage pumps Installation operation and maintenance manual English Peerless_USLetter_Front_PVF IO fm Page 1 Friday September 13 2019 10 38 PM...

Страница 2: ...or wear caused by abrasive materials nor does it cover damage resulting from misuse accident neglect or from improper operation maintenance installation modification or adjustment This warranty does...

Страница 3: ...Before starting any work on the product make sure that the power supply has been switched off and that it cannot be accidentally switched on Never do maintenance work on the pump when it is connected...

Страница 4: ...Excessive noise Death or serious personal injury If the operating noise level of the product exceeds local code or safe levels over 85 dBA the product must be installed in a controlled access area Pr...

Страница 5: ...10 11 12 6 13 14 20 21 22 15 16 17 18 19 6 6 6 6 TM060290 Fig Pump nameplate Pos Description Pos Description 1 Product number 12 Description 2 Nominal flow 13 Description 3 Nominal pressure 14 Serial...

Страница 6: ...nd FM approved Approvals B cFMus approved C UL listed approved D NFPA compliant E ULC approved F CCC X Special 1 Cast iron Casing material 2 Ductile iron X Special 7 Silicon bronze ASTM B584 Impeller...

Страница 7: ...itable for protection during shipment and during covered storage at a job site for a short period between installation and startup The preservatives applied at the factory have an effective life of tw...

Страница 8: ...ommend installing the base plate without the pump Position the foundation and the foundation bolts so that pump inlet and outlet flanges align with the outlet pipes Related information 4 4 2 Foundatio...

Страница 9: ...uate headroom must be provided to accommodate the pump to be handled plus the rigging WARNING Overhead load Death or serious personal injury Only lift the entire pump assembly with the lifting lugs pr...

Страница 10: ...pockets drill small vent holes through the base surface 5 Level off the grout to be flush with the top of the dam 6 Allow the grout to cure usually 48 to 72 hours before tightening the foundation bol...

Страница 11: ...pply before you start any work on the product Make sure that the power supply cannot be switched on accidentally Locate the electrical conduit and boxes so as to avoid obstruction of the pump Check sp...

Страница 12: ...otherwise specified by the customer Carefully check the packing allowing a slight leakage for lubrication Do not force the packing into a leak proof position as this will create excessive friction and...

Страница 13: ...ates freely 3 Check that the voltage and frequency on the motor nameplate match the current supply 4 Be sure the motor is wired for correct voltage 5 Check that all thermal overload relays are of the...

Страница 14: ...e pump WARNING Electric shock Death or serious personal injury Switch off the power supply before you start any work on the product Starting the motor during pump removal could damage pump and may cau...

Страница 15: ...st be replaced 1 Measure the outer diameter OD of the impeller wear surface or wear ring 8 and the inner diameter ID of the volute wear ring 7 2 Compute the diametrical clearance ID minus OD and compa...

Страница 16: ...depending on the severity of the environment For international destinations this will vary depending on the seaworthiness of the product s export packaging Related information 3 5 Handling and storin...

Страница 17: ...attention to the condition of the shaft seals or the packing and O rings Related information 7 1 Storage 7 1 5 Accessories storage Store accessories according to the manufacturer s instructions Relat...

Страница 18: ...between sleeve and shaft Check gaskets The suction head is insufficient The suction line is drawing air Tighten the line connections The suction lift is too high or there is insufficient NPSH Reduce...

Страница 19: ...r starting Joints are leaking Tighten the joints Tighten the packing Check o ring between sleeve and shaft Replace the gaskets The suction lift is too high or there is insufficient NPSH Reduce the suc...

Страница 20: ...rew impeller 83 Stuffing box 27 Ring stuffing box cover 119 O ring 9 Disposing of the product This product or parts of it must be disposed of in an environmentally sound way 1 Use the public or privat...

Отзывы: