2 of 27
ISSUED: 01-21-11 SHEET #: 083-9014-1
NOTE:
Read entire instruction sheet before you start installation and assembly.
Table of Contents
Tools Needed for Assembly
• stud
fi nder ("edge to edge" stud fi nder is recommended)
•
phillips screwdriver
• drill
• 5/16" (8mm) bit for concrete surface
• 1/8" (3mm) bit for wood studs
• level
• Do not begin to install your Peerless product until you have read and understood the instructions
and warnings contained in this Installation Sheet. If you have any questions regarding any of the
instructions or warnings, for US customers please call Peerless customer care at
1-800-865-2112, for all international customers, please contact your local distributor.
• This product should only be installed by someone of good mechanical aptitude, has experience
with basic building construction, and fully understands these instructions.
• Make sure that the supporting surface will safely support the combined load of the equipment and
all attached hardware and components.
• Never exceed the Maximum Load Capacity. See page one.
• If mounting to wood wall studs, make sure that mounting screws are anchored into the center of
the studs. Use of an "edge to edge" stud fi nder is highly recommended.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws fi rmly, but do not overtighten. Overtightening can damage the items, greatly
reducing their holding power.
• This product is intended for indoor use only. Use of this product outdoors could lead to product
failure and personal injury.
• This product was designed to be installed on the following wall construction only;
WALL CONSTRUCTION
HARDWARE REQUIRED
•
Wood
Stud
Included
•
Wood
Beam
Included
•
Solid
Concrete
Included
• Metal Stud
Do not attach except with Peerless Metal Stud Accessory
Kit; ACC215. Contact Customer Service for Peerless
metal
stud
accessory
kit.
•
Brick
Contact
Qualifi ed Professional
• Other or unsure?
Contact Qualifi ed Professional
WARNING
Parts List................................................................................................................................................3
Installation to Wood Stud Wall...............................................................................................................4
Installation to Solid Concrete or Cinder Block........................................................................................5
Cable Management................................................................................................................................8