Visit the Peerless Web Site at www.peerlessmounts.com
ISSUED: 03-23-09 SHEET #:055-9260-5 09-26-12
2 of 9
Note:
Read entire instruction sheet before you start installation and assembly.
Tools Needed for Assembly
• stud fi nder ("edge to edge" stud fi nder recommended)
• level
• drill
• 5/32" drill bit for wood studs
• 5/16" dill bit for solid concrete and cinder block
• phillips screwdriver
Accessories
• ACC-MIS550 (not evaluated by UL)
(cable accessory kit)
• ACC020 (not evaluated by UL)
(Projector Security Cable kit)
• WBK100 (not evaluated by UL)
(wall plate accessory kit )
• Do not begin to install your Peerless product until you have read and understood the instructions and warnings
contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, for US
customers please call Peerless customer care at 1-800-865-2112, for all international customers, please contact
your local distributor.
• This product should only be installed by someone of good mechanical aptitude, has experience with basic building
construction, and fully understands these instructions.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Never exceed the Maximum Load Capacity. See page one.
• If mounting to wood wall studs, make sure that mounting screws are anchored into the center of the studs. Use of
an "edge to edge" stud fi nder is highly recommended.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws fi rmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding
power.
• This product is intended for indoor use only. Use of this product outdoors could lead to product failure and personal
injury.
• This product was designed to be installed on the following wall construction only;
WALL CONSTRUCTION
HARDWARE REQUIRED
•
Wood
Stud Included
•
Wood Beam
Included
•
Solid Concrete
Included
•
Cinder Block
Included
•
Metal
Stud Contact
Qualifi ed Professional (not evaluated by UL)
•
Brick
Contact
Qualifi ed Professional (not evaluated by UL)
•
Other or unsure?
Contact Qualifi ed Professional (not evaluated by UL)
WARNING
Table of Contents
Parts List.................................................................................................................................................................................3
Installation to Wood Stud .................................................................................................................................................... 4,6
Installation to Solid Concrete/Cinder Block ....................................................................................................................... 5,7
Assembly of Adjustment Tube ...............................................................................................................................................8
Installing Projector Mount ......................................................................................................................................................8
Routing Cables .......................................................................................................................................................................9