P550c Operation Manual
5 System setup
94
5.2 Power on the controller
Warning!
The controller is not earthed. If system connects to any mains operated equipment, the
external equipment
must
be earthed in accordance with the manufacturer’s instructions. Failure to earth
the attached equipment may result in potentially lethal electric shock.
To power on the controller:
1 Open the two covers.
2 Press the power button to switch on the controller (
page 26
).
The
power LED on the handle is green when the controller is powered on.
3 The controller takes around 10 seconds to display the first screen:
-
When you power on the controller for the first time, the setup wizard launches; continue to
page 95
-
When you power on the controller on all subsequent occasions, the controller first prompts you to
calibrate the reel; continue to
page 99
Содержание Flexitrax P550c
Страница 54: ...P550c Operation Manual 4 System assembly www pearpoint com 54 Fig 4 6 Pipe clearance diagrams part 1...
Страница 55: ...P550c Operation Manual 4 System assembly www pearpoint com 55 Fig 4 7 Pipe clearance diagrams part 2...
Страница 56: ...P550c Operation Manual 4 System assembly www pearpoint com 56 Fig 4 8 Pipe clearance diagrams part 3...
Страница 103: ...P550c Operation Manual 5 System setup www pearpoint com 103 Fig 5 6 Settings menu...
Страница 213: ...P550c Operation Manual 7 Surveys www pearpoint com 213 Fig 7 6 Gmail account home...
Страница 215: ...P550c Operation Manual 7 Surveys www pearpoint com 215 Fig 7 9 Gmail Less secure app access...
Страница 276: ...P550c Operation Manual 13 Open Source Software www pearpoint com 276...