background image

 
 

IG-Genius1022 

Rev. 2A 

Page 5 of 8 

 

14. 

          

 

15. 

Switch the generator power 

OFF

 at the 

switch on the front panel.

 

Remove the mains cable completely from the 

power supply.

 

16. 

 
 
 
 
 
 
 
 

 

17.  

Re-attach both the RH & LH side panels to 

the generator, taking care to ensure the 

earth lead’s are reconnected correctly. The 

locks are secured by turning the lock 90

o

 to 

the left using the hex key provided. 

Once the side panels are securely 

assembled, the mains power supply can be 

reconnected. 

18. 

          

 

19. 

Switch the generator back 

ON

Leave the generator switched on for a period 

of 30 minutes to purge the system. 

Содержание Genius 1022

Страница 1: ...IG Genius1022 Rev 2A Page 1 of 8 Installation Guide Genius 1022 Generator FITTINGS KIT ...

Страница 2: ...urn the lock 90o to the right An earth lead is connected to the inside of the panel This can be removed by pulling it off the spade connector on the door 4 5 With the LH side panel removed you now have access to the LH transit bracket This is located under the LH compressor and is painted red To remove the transit bracket remove the 4 screws as indicated Once these screws have been removed the tra...

Страница 3: ...one of the 6mm push fit fittings and connect it to the port marked DRAIN on the rear of the unit using a 16mm or 5 8 spanner Fit the silencer fitting into the port marked NITROGEN OUT This only needs to be hand tight as this is a temporary fitting for the purge run and will be removed again prior to connecting to the instrument Connect the 6mm Teflon tubing to the drain line ensure the tube is pus...

Страница 4: ...ls are removed and the mains power is connected to the unit 12 13 Switch the generator power ON at the switch on the front panel The voltmeter is located on the underside of the compressor area This will measure and display the mains voltage that is being supplied to the generator Note the displayed voltage 220V 253V NOTE If the displayed voltage is 219V or less we would highly recommend fitting a...

Страница 5: ... RH LH side panels to the generator taking care to ensure the earth lead s are reconnected correctly The locks are secured by turning the lock 90o to the left using the hex key provided Once the side panels are securely assembled the mains power supply can be reconnected 18 19 Switch the generator back ON Leave the generator switched on for a period of 30 minutes to purge the system ...

Страница 6: ... from the NITROGEN OUT port Depending on the size of the inlet on the instrument select either the compression fitting or the remaining 6mm push fit fitting and attach to the NITROGEN OUT port If the compression fitting is used it is recommended that PTFE tape is applied to the thread to ensure a leak tight fit 24 25 Select the appropriate size Teflon Tube and connect to the NITROGEN OUT port If u...

Страница 7: ...er is required The 3m length of Teflon tube supplied in the fittings kit is to allow the generator to be installed adjacent to the instrument it is supplying If the generator is to be installed further away from the instrument then attention needs to be paid to pressure drops that could occur The maximum distance away from the instrument the generator can be placed still using 6mm 4mm internal dia...

Страница 8: ...IG Genius1022 Rev 2A Page 8 of 8 ...

Отзывы: