background image

Peak Scientific

Fountain Crescent
Inchinnan Business Park
Inchinnan
PA4 9RE
Scotland, UK

Tel:

 +44 141 812 8100

Fax:

 +44 141 812 8200

For further information on any of our 

generator products please contact 

[email protected]

Peak Scientific has highly trained, fully certified Field Service Engineers located in over 20 countries 
across every continent around the world. This allows us to provide an industry-leading rapid response 
service to our customers. With 

[Peak Protected]

, your laboratory’s productivity becomes our top 

priority.

To discuss Peak Protected generator cover and payment options speak to your local Peak 
Representative or for further information contact: 

[email protected]

Please visit 

www.peakscientific.com/downloads

 to 

download the full User Manual for your gas generator.

Precision Hydrogen Installation Guide Rev 4 RSID 2370  PN IG-PREC-H2PCB  EN 18/01/22

Содержание Precision Hydrogen

Страница 1: ...Precision Hydrogen Installation Guide Rev 4 RSID 2370 PN IG PREC H2PCB EN 18 01 22 Precision Hydrogen All Colour Screen Models Installation Guide...

Страница 2: ...allation guide is intended to be used as a step by step quick start guide to facilitate installation and configuration Please visit www peakscientific com downloads to download the full User Manual fo...

Страница 3: ...er the protection provided by the equipment may be impaired WARNING WARNING WARNING WARNING CAUTION Safety Notices Peak Scientific Instruments cannot anticipate every possible circumstance which may r...

Страница 4: ...m x1m x1 Tygon Tubing 05 3131 Barbed Fitting 05 7029 Page 4 US Mains Cable C13 5 15 04 1039 US Mains Cable C13 6 15 04 1029 Teflon Tubing 00 4411 4L Water Bottle 10 9016 x1 See Section 14 Regarding Co...

Страница 5: ...position on a flat surface in desired area WARNING the weight of the unit constitutes a two man lift Safe lifting practices are advised 1 2 Ensure that there is at least 7 5 cm of space to the sides...

Страница 6: ...bing must be clean grade copper or stainless steel only Copper Stainless Steel only Hydrogen Trace Hydrogen Copper Stainless Steel only 4B Copper Stainless Steel only 3 Remove the two Transit Plugs fr...

Страница 7: ...use the supplied Teflon Tubing 5A Hydrogen Trace Hydrogen 5B 00 4411 00 4411 00 4411 00 4411 6 The Tygon Tubing and Barbed Fitting supplied in the generator fittings kit should be connected to the Fil...

Страница 8: ...Grade De Ionised Water 1 S cm 20 C If using a Peak Water Bottle connect the remaining Barbed Fitting from the fittings kit to the other end of the Tygon Tubing If using an alternative water bottle co...

Страница 9: ...Page 9 9 After the bottle has been rinsed it should be filled with High Grade De Ionised Water 10 CAUTION Once the bottle has been filled replace the lid...

Страница 10: ...end of the Tygon Tubing to the connection on the top of the filled Water Bottle ensuring there is a secure connection Ensure the lid is securely fastened by turning it clockwise and that the air hole...

Страница 11: ...ns cable from the fittings kit and plug the IEC 60320 C13 cable into the mains input at the rear of the generator Please note both 110V and 230V US cables have been supplied ensure correct mains cable...

Страница 12: ...n the back of the unit Plug the mains cable into an appropriate 100 230VAC 50 60Hz single phase power supply CAUTION ensure the correct cable has been selected for your electrical supply 100 230VAC 50...

Страница 13: ...ow run diagnostics and a leak detection test Note In the unlikely event that diagnostics are unsuccessful an alarm will sound and a yellow failure screen will be displayed complete with a mute button...

Страница 14: ...ctively Press the SAVE button to store the new value 20 Upon successful completion of the diagnostic checks the home screen will be displayed The user should now select MENU System State Standby Press...

Страница 15: ...it of measure and pressure have been selected pressing HOME will return the user to the home screen 22 Pressing START will start the supply to the application The unit may take a few minutes to adjust...

Страница 16: ...return the generator to Standby mode 24 The unit will now maintain the desired pressure while the application is supplied System State Running Pressure Target Current Units 25 00 25 00 psi Stop Menu S...

Страница 17: ...enerators hydrogen outlet to the Application Before connecting the generator to the application it is recommended to purge the generator to atmosphere for a maximum period of 10 minutes to evacuate an...

Страница 18: ...rator is now fully installed operational and ready to supply gas on demand to your instrument 27 It is recommended that any Precision Trace unit is left to run for 24 hours and the Hydrogen unit is le...

Страница 19: ...recommended Extended periods at extremes can have a detrimental effect on the operation and life of the Generator Ensure that all pipework between generator and equipment is checked for leaks Please...

Страница 20: ...arranty peakscientific com Product Warranty Registration Contact name Email address Company Address City town Postcode Country Telephone Generator serial Model type Installation date Do you still use...

Страница 21: ...Page 21...

Страница 22: ...Page 22...

Страница 23: ...Page 23...

Страница 24: ...ry continent around the world This allows us to provide an industry leading rapid response service to our customers With Peak Protected your laboratory s productivity becomes our top priority To discu...

Отзывы: