background image

Page 20

1. Electrical requirements for 230V generators are 195V - 253V 50/60Hz. For 195V - 

219V would highly recommend fitting a Dual Tap Transformer 06-3200 (XE 35) or 06-

3210 (XE 70).
2. Electrical requirements for the 120V generator is 114V to 126V at 60 Hz. 
3. The Teflon tube supplied in the fittings kit is to allow the generator to be installed 

adjacent to the instrument it is supplying. If the generator is to be installed further 

away from the instrument then attention needs to be paid to pressure drops that could 

occur. The maximum distance away from the instrument the generator can be placed 

still using 6mm (4mm internal diameter) or 

¼

” (3/16” internal diameter) tubing is 3m.  

For further information relating to tubing lengths please refer to the user manual.

Electrical Requirements

Generator

Voltage

Frequency

Plug Type

230

120

50

60

Genius XE 35

UK, EU, US 230V, 

US 120V

Genius XE 70

UK, EU, US 230V

Please familiarise yourself with the full 

User Manual 

available at 

www.peakscientific.

com/downloads

.

 

This includes all other technical specifications, operating 

instructions, service requirements, contact details and trouble shooting.
                                                                                                                                                      

                                                                                                                                                      

                                           

General Notes

Содержание Genius XE 35

Страница 1: ...GeniusXE Installation Guide Rev 5 PN IG 0022 RSID 2300 EN 20 11 19 Genius XE Series All Models Installation Guide Register product to operate at www peakscientific com activate IMPORTANT IMPORTANT...

Страница 2: ...for warranty your generator must be registered to the end user not a reseller or distributor and must have a paid annual preventative maintenance arranged within 12 months of the installation date car...

Страница 3: ...tart Guide to facilitate safe and correct installation and initial configuration of your Peak Scientific gas generator For more extensive user operation directions we recommend you download the User M...

Страница 4: ...CAUTION notice denotes a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause damage to the Generator or the Application D...

Страница 5: ...FE Tubing 00 1266 x2 6mm Push Fit Fitting 02 4600 Fittings Kit Genius XE 35 x1 4mm Hex Key 3300407 x1 US Mains Cable 120V C19 5 15 04 1035 x1 Flow Control SIlencer 02 1096 x1 1 4 Compression Fitting 0...

Страница 6: ...s Cable C19 04 1026 x6m 1 4 PTFE Tubing 00 1266 x3 6mm Push Fit Fitting 02 4600 Fittings Kit Genius XE 70 x1 4mm Hex Key 3300407 x1 Flow Control SIlencer 02 1096 x2 1 4 Compression Fitting 02 4421 x6m...

Страница 7: ...t to acclimatize for 3 hours 1 2 First remove the compressor transit brackets These can be accessed by removing the generator s right hand side and top panels Starting with the top panel use the 4mm H...

Страница 8: ...ght hand side panel to the rear of the generator then tilt outwards and slide backwards to release the side plate from the generator 4 With the right hand side plate removed use an 8mm spanner to remo...

Страница 9: ...them stating Remove before use To remove the transit brackets use a 10mm spanner to remove the two screws on each bracket as indicated then slide the brackets out from underneath the compressors Ther...

Страница 10: ...nel to the generator Ensure all screws are firmly tightened Select the 6mm Push Fit Fitting 02 4600 and attach to the Drain port at the rear of the generator Attach the Flow Control Silencer 02 1096 t...

Страница 11: ...ainer The container MUST NOT have an airtight seal as water and air will be expelled periodically under a slight pressure The generator will expel up to 5L per 24 hours depending on ambient humidity S...

Страница 12: ...ble into the corresponding 120VAC 60Hz OR 230VAC 50 60Hz single phase power supply CAUTION ensure the correct cable has been selected for your electrical supply Consult the Electrical Requirements sec...

Страница 13: ...r by downloading the Peak mobile app from the Google Play Store or Apple App Store A PIN code may also be requested by phoning the Peak helpdesk You will require the generator serial number which is d...

Страница 14: ...n its front display The voltage reading should be checked prior to the initial purge of the system The supply voltage will be displayed on the touch screen when the generator is switched on If the rea...

Страница 15: ...e system 30 minutes If required the output pressure can be adjusted using the pressure regulator at the rear of the generator View the pressure gauge below the regulator when setting the pressure This...

Страница 16: ...pressure gauge at the rear of the unit reads 0 the silencer fitting can be removed from the Nitrogen port After 30 minutes of running the generator can be turned OFF Allow the stored gas in the inter...

Страница 17: ...select either the Compression Fitting 02 4421 or the remaining 6mm Push Fit Fitting 02 4600 Attach the appropriate sized Teflon tubing to the fitting attached to the nitrogen port and connect to the...

Страница 18: ...generator will once again show the initialisation screen Initialisation Model GENIUS XE 35 Software v0 00 Voltage 230V RMS Initialisation Time 00 00 Continue Switch the generator ON using the switch...

Страница 19: ...entific gas generator is now fully installed operational and ready to supply gas on demand to your instrument The pressure display will again gradually increase to the factory set pressure GENIUS XE 3...

Страница 20: ...eeds to be paid to pressure drops that could occur The maximum distance away from the instrument the generator can be placed still using 6mm 4mm internal diameter or 3 16 internal diameter tubing is 3...

Страница 21: ...Page 21...

Страница 22: ...Page 22...

Страница 23: ...Page 23...

Страница 24: ...usXE Installation Guide Rev 5 PN IG 0022 RSID 2300 EN 20 11 19 Peak Scientific has highly trained fully certified Field Service Engineers located in over 20 countries across every continent around the...

Отзывы: