background image

Page 15

20.

19.

Select the 

¼” Compression Fittings 02-4421  

and connect to the 

Nitrogen

 and

 Air 

ports.

Attach the 

¼” Teflon tubing 00-1266 

to the fittings attached to the 

Nitrogen 

and

 Air 

ports

 and connect to the corresponding 

gas inlets of your instrument

.

00-1266

02-4421

Содержание 3300825

Страница 1: ...Halo Installation Guide Rev 2 PN IG 0027 RSID 2625 EN 16 01 19 Halo Installation Guide ...

Страница 2: ...on of your Peak Scientific gas generator For more extensive user operation directions we recommend you download the User Manual from the website Please visit www peakscientific com downloads to download the full User Manual for your gas generator Thank you for selecting Peak Scientific to meet your laboratory gas generation needs and should you require any further assistance or support please do n...

Страница 3: ...A CAUTION notice denotes a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause damage to the Generator or the Application Do not proceed beyond a CAUTION notice until the indicated conditions are fully understood or met Caution risk of electric shock Ensure power to the Generator has been removed before proceeding Safety...

Страница 4: ...ins Cable C19 6 15 04 1024 x1 EU Mains Cable C19 04 1026 6mm OD x 4mm ID PE 00 1282 x1 2x3m 4mm Hex Key 3300407 Teflon Tubing 00 1266 2x3m Fittings Kit x2 Compression Fitting 02 4421 x3 6mm Push Fit Fitting 02 4600 x2 Flow Control SIlencer 02 1096 ...

Страница 5: ...d area 1 2 First remove the compressor transit brackets These can be accessed by removing the generator side panels Starting with the left hand side panel use the 4mm Hex Key 3300407 and remove the M5 cap screws and washers from the rear tabs of the panel located in the top and bottom corners ...

Страница 6: ...ed remove the left hand side panel 4 The transit brackets are located below the compressors inside the compressor compartment Disconnect the fan power cables then using the 4mm Hex Key 3300407 remove 8 x M5 cap screws and washers and keep in a safe place ...

Страница 7: ...5 To remove the transit brackets remove the 2 x M5 pozi drive screws and washers on each compressor tray using a pozi drive screwdriver not supplied Retain the screws and washers Remove the compressor fan panel ...

Страница 8: ...Page 8 6 5 With the screws removed slide each transit bracket out from underneath the compressor Remove the 2 x M5 cap screws on each compressor base plate using the 4mm Hex Key 3300407 ...

Страница 9: ...secure the compressor trays Replace the compressor fan panel ensuring the fan power cables are reconnected and finally replace the left hand side panel Connect the 2 x Flow Control Silencers 02 1096 to the Nitrogen and Air ports at the rear of the generator 02 1096 ...

Страница 10: ...her end of the tubing to a suitable drain connection or container The container MUST NOT have an airtight seal as water and air will be expelled periodically under a slight pressure Select the 6mm Push Fit Fitting 02 4600 and attach to the Drain port at the rear of the generator 02 4600 00 1282 ...

Страница 11: ... plug the cable into the mains input at the rear of the generator 230VAC 50 60Hz Plug the mains cable into the corresponding 230VAC 50 60Hz single phase power supply CAUTION ensure the correct cable has been selected for your electrical supply UK EU US 230V CAUTION 04 1024 04 1025 04 1026 ...

Страница 12: ...Page 12 14 13 Switch the generator power ON using the switch on the rear panel The pressure gauges on the rear panel will gradually increase to the factory set pressures ...

Страница 13: ...Page 13 16 15 Leave the generator switched on for a period of 30 minutes to purge the system During the purge the purity light indicator should turn green SERVICE 30 minutes ...

Страница 14: ...the generator can be turned OFF Allow the stored gas in the internal tanks to dissipate The purge is now complete Once the pressure gauges at the rear of the generator read 0 the silencer fittings can be removed from the Nitrogen and Air ports ...

Страница 15: ...ession Fittings 02 4421 and connect to the Nitrogen and Air ports Attach the Teflon tubing 00 1266 to the fittings attached to the Nitrogen and Air ports and connect to the corresponding gas inlets of your instrument 00 1266 02 4421 ...

Страница 16: ...Page 16 22 21 Switch the generator power ON using the switch on the rear panel The pressure gauges on the rear panel will again gradually increase to the factory set pressure ...

Страница 17: ...ge 17 24 23 The purity light indicator should turn green SERVICE CONGRATULATIONS Your Peak Scientific gas generator is now fully installed operational and ready to supply gas on demand to your instrument ...

Страница 18: ...ator is to be installed further away from the instrument then attention needs to be paid to pressure drops that could occur The maximum distance away from the instrument the generator can be placed still using 6mm 4mm internal diameter or 3 16 internal diameter tubing is 10m For further information relating to tubing lengths please refer to the user manual Please familiarise yourself with the full...

Страница 19: ...fic com For generators that remain unregistered after 1 month from the shipment date the warranty will be considered active from the date of factory dispatch Complete Plan only Go Online or Complete and Return We know that registering any of your recently purchased products is not the first thing on your mind but it is very important to both of us Not all warranties are alike and Peak Scientific s...

Страница 20: ...alo Installation Guide Rev 2 PN IG 0027 RSID 2625 EN 16 01 19 Peak Scientific has highly trained fully certified Field Service Engineers located in over 20 countries across every continent around the world This allows us to provide an industry leading rapid response service to our customers With Peak Protected your laboratory s productivity becomes our top priority To discuss Peak Protected genera...

Отзывы: