![Peak Hill Industries IMMOBILIZER SHEEP WORKER Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/peak-hill-industries/immobilizer-sheep-worker/immobilizer-sheep-worker_operation-manual_1517302008.webp)
8
ASSEMBLY
1. LOCATION
Place the IMMOBILIZER in a location that allows easy access around the
machine and enough space for all attachments including your leadup
system. It will be much harder to move once all attachments are in position
2. LEADUP
• Before ramps there should be at least 8-10 metres of sheep in single file
• Panels 400mm apart works best so sheep cannot turn around
• Have the panels set up so the last sheep can be seen by new sheep
coming into leadup system
• The more sheep in single file the better
• Keep good access for dogs and people beside the leadup race
• Forcing pen before panels should hold 20-30 sheep
• A holding pen after exiting will help to draw the new sheep in
• If sheep are jumping as they walk into machine. Place an object like a
200lt drum about 3 metres away from front of machine
• Release sheep into small pens to save time if a sheep needs re-processing
Содержание IMMOBILIZER SHEEP WORKER
Страница 2: ......
Страница 23: ...23 NOTES...