
5.2 AC CIRCUIT WIRING
PART
LOCATION
QTY
[1] 120VAC POWER CORD
WIRE BAG
1
[2] 16AWG, WHITE, SPADE TO BARE
WIRE BAG
1
[3] AC TO SSR, 16AWG BLUE
BARE TO BARE, 100-150mm
WIRE BAG
1
DETAIL R
SEE DETAIL R
FUSE TO BLUE
SPADE END TO
SILVER SWITCH
TERMINAL
FUSE TO POWER
SUPPLY "L" BLUE
STRIPPED END
[1] AC POWER CORD BLACK
SPADE TERMINAL TO CENTER
SWITCH SILVER TERMINAL
[2] TO POWER
SWITCH "N"
GOLD TERMINAL
[3] SSR "~" TO
POWER SUPPLY "L"
FROM FUSE, BLUE
TO POWER SUPPLY "L"
HEATED BED WHITE
TO POWER SUPPLY "N"
[2] POWER SWITCH
TO POWER SUPPLY "N"
[1] AC POWER CORD, WHITE
TO POWER SUPPLY "N"
POWER SUPPLY
"G" TO BROWN
HEATED BED GND
[1] AC POWER CORD
GROUND, GREEN
TO POWER SUPPLY "G"
SSR "~" TO HEATED
BED BLUE WIRE
ALL BLUE LINES SHOW WIRE
ROUTING. USE DESCRIPTIONS TO
MAKE CONNECTIONS, NOT ILLUSTRATIONS