background image

Model M1403-03ADB

FATIGUE RATED LOW PROFILE LOAD CELL, DUAL BRIDGE, METRIC

Installation and Operating Manual

For assistance with the operation of this product,

contact PCB Piezotronics, Inc.

Toll-free: 800-828-8840

24-hour SensorLine: 716-684-0001

Fax: 716-684-0987

E-mail: [email protected]

Web: www.pcb.com

Содержание M1403-03ADB

Страница 1: ...D CELL DUAL BRIDGE METRIC Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 71...

Страница 2: ...ty regimen When in doubt about a calibration cycle a good rule of thumb is to recalibrate on an annual basis It is also good practice to recalibrate after exposure to any severe temperature extreme sh...

Страница 3: ...rchase Order should include authorization to proceed and return at current pricing which can be obtained from a factory customer service representative Contact Information International customers shou...

Страница 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Страница 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Страница 6: ...LECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6 6 1 2 Hy...

Страница 7: ...the parts under test have completed the planned fatigue test cycles 3 0 OVERVIEW Dual bridge fatigue rated load cells are specifically designed for repetitive testing Applications include material te...

Страница 8: ...ote that the performance of the load cell may be affected if the factory installed mounting base is removed or modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is...

Страница 9: ...ctor Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not break o...

Страница 10: ...wiring may result in unstable or noisy signals A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structur...

Страница 11: ...s are adjusted such that the error due to eccentric loading is less than 0 1 per inch of offset Side loads moments and torque must be limited to avoid electrical or mechanical damage to the load cell...

Страница 12: ...tion certificate and adjust the span or gain until the display reads the force value stated on the certificate 4 Repeat steps 1 3 to verify that a valid calibration setting has been obtained 5 If poss...

Страница 13: ...ridge resistances A D excitation and B C the signal leads 9 Check bridge balance 10 Keep a record of your observations correct problems or contact PCB factory for assistance 11 2 1 Estimating Bridge B...

Страница 14: ...factory for any reason For calibration services if possible a copy of the purchase order covering the requested services should be included with the returned load cell 13 0 WARRANTY Standard warranty...

Страница 15: ...in x 2 50 in 104 60 mm x 63 50 mm 8 Weight 6 4 lb 2 9 kg Mounting Thread No English Equivalent M16 x 2 0 Sensing Element Strain Gage Strain Gage Mounting Torque 200 in lb 23 Nm Deflection at Full Sca...

Страница 16: ...LOAD CELLS 5 8 18UNF 3B METRIC M LOAD CELLS M16X2 0 4H SPECIAL LOAD CELL 1 14UNS 3B 2 50 63 5 030 76 45 THREAD x 88 22 3 STANDARD LOAD CELLS 5 8 18 UNF 3B METRIC M LOAD CELLS M16 X 2 0 4H SPECIAL LOA...

Отзывы: