DUAL BRIDGE LOAD CELL OPERATION MANUAL 

 

4

 

 
 
 
 
 
 
 

4.3 Threaded Tension Rods 

NOTE:  Threaded  tension  rods  are  an  optional  feature  on  the 

dual bridge fatigue-rated load cell.   

 
Installation  of  the  load  cell 
starts  with  tension  pre-loading 
the  load  cell  to  120-150%  of 
full  scale  capacity  and  lightly 
tightening  a  jam  nut  to  lock  in 
the preload on both the load cell 
and base tension rods. Once the 
preload  tension  is  released,  the 
threads 

will 

be 

securely 

engaged. 
 
 Failure 

to 

pre-load 

the 

attachment  rods/  fixtures  can 
result  in  damage  to  the  threads 
on the load cell and base during 
cyclic load tests. 
 
Threaded  rods  engaging  the  load  cell  should  have  Class  3 
threads to ensure thread-to-thread close contact forces. 
 
NOTE:  It  is  important  that  the  tension  rods  installed  in  the 

load cell and base use full thread engagement, but are 
not  jammed,  or  torqued.    They  should  be  ½-1  turn 
from  the  bottom  of  the  threads  in  both  the  base  and 
load cell. 

 

4.4 Mounting Optional Connector Protectors 

Models 1403 and 1404 dual bridge fatigue-rated load cells do 
not  come  standard  with  connector  protectors.    If  optional 
connector  protectors  are  to  be  mounted,  it  is  necessary  to 
consider the following: 

4.4.1 Included Components in Kit (084A90) 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

4.4.2 Required Tools 

 
 
 
 
 
 

4.4.3 Installation of Connector Protector 

 

1.

 

Remove the #4-40 x 1/4” button head cap screws 
from the connector using a 1/16” hex wrench as 
shown in Figure 7. 

 

2.

 

Carefully pull the connector from the load cell.  Take 
care to not break or loosen any wire connections. 

 

3.

 

Slide the connector protector (54823-02) behind the 
connector as shown in Figure 8. 

 

4.

 

Apply a drop Loctite® Threadlocker Blue 242® to 
the threads of the #4-40 x 3/8” socket head cap 
screws.  

 
NOTE:  Please refer to the Loctite® Threadlocker Blue 242® 

technical data sheet for directions of use. 

 

5.

 

Attach the connector protector (54823-02) to the load 
cell with the #4-40 x 3/8” socket head cap screws 
using a 3/32” hex wrench as shown in Figures 9 and 
10. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Bolt Size 

Part Number 

 Installation Torque 

1/4-28x1 3/4

 

100-8011-10 

15-17 LbFt (180-204 LbIn) 

3/8-24x2 1/4

 

100-8082-20 

75-80 LbFt (900-960 LbIn) 

1/2-20x3 1/2

 

100-8011-30 

120-130 LbFt (1440-1560 LbIn) 

3/4-16x4 1/2

 

100-10026-40 

370-400 LbFt (4440-4800 LbIn) 

 

Table 4

 

– Tension Base Installation Torque Values 

 

Jam Nut 

Preload (120-150% FS) 

Pre-Tension 

Stud w/3B 

Threads 

Jam Nut 

Pre-Tension 

Stud w/3B 

Threads 

Preload (120-150% FS) 

Figure 4

 

– Installation of Pre-

Tension Studs 

Table 5 - Kit Components 

 

Component 

Quantity 

Connector Protector (54823-02) 

#4-40 x 3/8” Socket Head Cap Screw 

 

Figure 5 - Connector 

Protector (54823-02) 

Figure 6 - #4-40 x 3/8” 

Socket Head Cap Screw 

Table 6—Required Tools (Not Included) 

 

1/16” Hex Wrench 

3/32” Hex Wrench 

Loctite® Threadlocker Blue 242® 

 

Figure 7 - Remove the #4-40 x 1/4” 

Button Head Cap Screws 

Figure 8 - Slide the Connector 

Protector (54823-02) Behind the 

Connector 

 

 

 

 

Содержание 1411-02ADB

Страница 1: ...DUAL BRIDGE Installation and Operating Manual For assistance with the operation of this product contact PCB Load Torque Inc Toll free 866 684 7107 24 hour SensorLine 716 684 0001 Fax 248 888 8266 E ma...

Страница 2: ...alized tests including sensitivity at elevated or cryogenic temperatures phase response extended high or low frequency response extended range leak testing hydrostatic pressure testing and others For...

Страница 3: ...tion on particular operating steps The following symbols may be found on the equipment described in this manual This symbol on the unit indicates that high voltage may be present Use standard safety p...

Страница 4: ...China RoHS 2 Disclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O...

Страница 5: ...O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indicates that sai...

Страница 6: ...LECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6 6 1 2 Hy...

Страница 7: ...the parts under test have completed the planned fatigue test cycles 3 0 OVERVIEW Dual bridge fatigue rated load cells are specifically designed for repetitive testing Applications include material te...

Страница 8: ...ote that the performance of the load cell may be affected if the factory installed mounting base is removed or modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is...

Страница 9: ...ctor Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not break o...

Страница 10: ...wiring may result in unstable or noisy signals A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structur...

Страница 11: ...s are adjusted such that the error due to eccentric loading is less than 0 1 per inch of offset Side loads moments and torque must be limited to avoid electrical or mechanical damage to the load cell...

Страница 12: ...tion certificate and adjust the span or gain until the display reads the force value stated on the certificate 4 Repeat steps 1 3 to verify that a valid calibration setting has been obtained 5 If poss...

Страница 13: ...ridge resistances A D excitation and B C the signal leads 9 Check bridge balance 10 Keep a record of your observations correct problems or contact PCB factory for assistance 11 2 1 Estimating Bridge B...

Страница 14: ...factory for any reason For calibration services if possible a copy of the purchase order covering the requested services should be included with the returned load cell 13 0 WARRANTY Standard warranty...

Страница 15: ...80 mm 8 Weight 135 lb 61 3 kg Mounting Thread 2 3 4 8 UN 3B No Metric Equivalent Sensing Element Strain Gage Strain Gage Mounting Torque 6000 lbf in 678 Nm Deflection at Full Scale Capacity 0 001 in 0...

Страница 16: ...ECTOR WIRING CODE TYPICAL PIN A EXC PIN B SIG PIN C SIG PIN D EXC PIN E N C PIN F N C CONNECTOR B DUAL BRIDGE ONLY PROTECTIVE SHROUD THREAD x2 56 65 0 STANDARD LOAD CELL 2 3 4 8 UN 3B METRIC M LOAD CE...

Отзывы: