background image

Figure 1: Control Locations

B. Operating Instructions:

Instructions to place the boiler in operation and to turn off the boiler are

shown on the Lighting Instructions Label posted on the inside of the front jacket panel of the boiler.
The instructions are also shown in Figures 2, 3 and 4.

C. Sequence of Operation:

1. Thermostat calls for heat.

2. Limit senses boiler water temperature. Prevents operation until water temperature falls

approximately 15°F (8°C) below the cut-out temperature.

3. Automatic vent damper (if used) opens.

4. Gas valve energizes.

a. Intermittent Ignition

1. Igniter on.

2. Pilot gas on, igniting pilot.

b. Standing Pilot.

1. Gas valve energizes.

c. Spark Ignited Pilot.

1. Igniter Sensor Sparks.

2. Pilot gas on, igniting pilot.

5. Pilot flame detected.

a. Intermittent Ignition. Pilot flame detected.

1. Igniter off.

2. Main gas on, igniting main burners.

3

Содержание Series GM

Страница 1: ...ty damage personal injury or loss of life W WA AR RN NI IN NG G Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMEL...

Страница 2: ...are present in the combustion area The control is a single use device If the control is activated to interrupt boiler operation do not attempt to place boiler in operation Contact a qualified service...

Страница 3: ...calls for heat 2 Limit senses boiler water temperature Prevents operation until water temperature falls approximately 15 F 8 C below the cut out temperature 3 Automatic vent damper if used opens 4 Ga...

Страница 4: ...rs Note If pilot flame is not detected main and pilot gas are automatically turned off Refer to Paragraph B above to resume operation c Spark Ignited Pilot Pilot flame detected 1 Main gas on igniting...

Страница 5: ...Figure 2 Operating Instructions SmartValve Intermittent Ignition boiler model suffix SV 5...

Страница 6: ...Figure 3 Operating Instructions Spark Ignition boiler model suffix SPRK 6...

Страница 7: ...Figure 4 Lighting Instructions Standing Pilot boiler model suffix STDG 7...

Страница 8: ...ify operation follows Sequence of Operation see page 3 3 View flames through observation port See Figure 1 4 Check pilot flame See Figures 5 and 6 The pilot flame should be medium blue covering approx...

Страница 9: ...l For continued safe operation a qualified service agency must provide a more detailed inspection of burners heat exchanger and vent system and provide maintenance as specified in the Installation Ope...

Страница 10: ...entilation Wear a NIOSH MSHA approved respirator Wear long sleeved loose fitting clothing and gloves to prevent skin contact Wear eye goggles Minimize airborne dust prior to handling and removal by wa...

Отзывы: